|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2017 Measured TD: 8343 ft. Vertical TD: 8191 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/27/2012 | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 2050 FSL 652 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 2050 FSL 652 FEL | Proposed Depth/Form: | 7778 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7778 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 200 ft., Bottom: 7778 ft. |
| | |
Wellbore Completed | Completion Date: | 1/21/2011 | Spud Date: | 1/15/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8343 ft. | Measured PB depth: | 8245 ft. | True Vertical TD: | 8191 ft. | True Vertical PB depth: | 8093 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 2050 FSL 652 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 2050 S 652 E | Log Types: | Cement Bond Log Gamma Ray
Compensated Density Compensated Neutron Dual Induction | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 949 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 0 ft., Bottom: 949 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8318 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 4010 ft., Bottom: 8318 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4510 ft. | | | | SUSSEX | 4891 ft. | | | | NIOBRARA | 7712 ft. | | | | FORT HAYS | 8136 ft. | | | | CODELL | 8158 ft. | | | |
Formation CODL Formation Classification: GW Status: PR - 12/1/2017 Interval Top: 8154 ft. Interval Bottom: 8174 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/2/2013 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/3/2013 | Treatment End Date: | N/A | Treatment Summary: | Drilled out CIBP on 1/18/13 that had been set @ 8100' over the Codell. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 3/28/2012 | Treatment Summary: | Set CIBP | Formation Treatment | Treatment Date: | 3/28/2011 | Treatment Summary: | SLICKWATER FRAC THE CODELL FORMATION FROM 8154 TO 8174, THE CODELL FORMATION BROKE AT 3425 PSI, AND TREATED AT AN AVERAGE RATE OF 62 BPM, AVERAGE TREATMENT PRESSURE 4850 PSI, THE TOTAL FLUID PUMPED WAS 5391 BBL, THE TOTAL PROPPANT WAS 89,440 LBS OF 30/50 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1387 | CALC_BBLS_H2O | 89 | CALC_BBLS_OIL | 26 | CALC_GOR | 2308 | CALC_MCF_GAS | 60 | CASING_PRESS | 2300 | GRAVITY_OIL | 49 |
| Perforation Data: | Interval Top: | 8154 ft. | # Of Holes: | 80 | Interval Bottom: | 8174 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 12/1/2017 Interval Top: 7726 ft. Interval Bottom: 8174 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/2/2013 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/2/2013 | Treatment End Date: | N/A | Treatment Summary: | Drilled out CIBP on 1/18/13 that had been set @ 8100' over the Codell, Commingling the Codell and Niobrara. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8140 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/2/2013 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 39 | BTU_GAS | 1212 | CALC_BBLS_OIL | 39 | CALC_GOR | 4435 | CALC_MCF_GAS | 173 | CASING_PRESS | 1200 | GRAVITY_OIL | 53 | MCF_GAS | 173 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 7726 ft. | # Of Holes: | 128 | Interval Bottom: | 8174 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 4/10/2013 Interval Top: 7726 ft. Interval Bottom: 8020 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/2/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/3/2013 | Treatment End Date: | N/A | Treatment Summary: | Drilled out CIBP on 1/18/13 that had been set @ 8100' over the Codell. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 65 | BTU_GAS | 1387 | CALC_BBLS_OIL | 65 | CALC_GOR | 1430 | CALC_MCF_GAS | 93 | CASING_PRESS | 1175 | GRAVITY_OIL | 51 | MCF_GAS | 93 | TUBING_PRESS | 950 |
| Perforation Data: | Interval Top: | 7726 ft. | # Of Holes: | 48 | Interval Bottom: | 8020 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 204 |
Total Gas Produced (MCF) | 1776 |
GOR | 8705 |
GOR Determination | BOE |
Average BOE per Day | 1.391 |
Average MCFE per Day | 8.092 |
Federal Financial Assurance | i | |
|
|