|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/31/2019 Measured TD: 7975 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/31/2019 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 6/22/2012 | Proposed Depth/Form: | 7900 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 272, Top: 0 ft., Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7900 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 754, Top: , Bottom: 7900 ft. |
| | |
Wellbore Completed | Completion Date: | 3/26/2012 | Spud Date: | 3/22/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7975 ft. | Measured PB depth: | 7919 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, Triple Combo | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 732 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 307, Top: 0 ft., Bottom: 732 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7965 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 3870 ft., Bottom: 7965 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3837 ft. | | | | SUSSEX | 4440 ft. | | | | SHANNON | 5305 ft. | | | | NIOBRARA | 7058 ft. | | | | FORT HAYS | 7306 ft. | | | | CODELL | 7329 ft. | | | | MOWRY | 7761 ft. | | | | J SAND | 7777 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/31/2019 Interval Top: 7798 ft. Interval Bottom: 7822 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/30/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 4/19/2012 | Treatment Summary: | Pumped 266,150 lbs of Ottawa Proppant, 11,507 lbs of SB Excel Proppant and 148,012 gallons of Slick Water and Silverstim.
The J-Sand is producing through a composite flow through plug. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7798 ft. | # Of Holes: | 96 | Interval Bottom: | 7822 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/21/2012 Interval Top: 7329 ft. Interval Bottom: 7345 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/30/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 4/28/2012 | Treatment Summary: | Pumped 256,592 lbs of Ottawa Proppant and 119,351 gallons of 15% HCL, Slick Water, and Silverstim.
The Codell is producing through a composite flow through plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7329 ft. | # Of Holes: | 64 | Interval Bottom: | 7345 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/11/2012 Interval Top: 7149 ft. Interval Bottom: 7822 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2012 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 27 | BBLS_OIL | 8 | BTU_GAS | 1250 | CALC_BBLS_H2O | 27 | CALC_BBLS_OIL | 8 | CALC_GOR | 61375 | CALC_MCF_GAS | 491 | CASING_PRESS | 1513 | GRAVITY_OIL | 59 | MCF_GAS | 491 |
| Perforation Data: | Interval Top: | 7149 ft. | # Of Holes: | 208 | Interval Bottom: | 7822 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/31/2019 Interval Top: 7149 ft. Interval Bottom: 7345 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/30/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7149 ft. | # Of Holes: | 112 | Interval Bottom: | 7345 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/21/2012 Interval Top: 7149 ft. Interval Bottom: 7263 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/30/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 4/28/2012 | Treatment Summary: | Pumped 257,984 lbs of Ottawa Proppant and 163,464 gallons of Slick Water and Silverstim.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7149 ft. | # Of Holes: | 48 | Interval Bottom: | 7263 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
Reported Plugged | Y | 07/31/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|