|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/19/2024 Measured TD: 7815 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/19/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 6/22/2012 | | Proposed Depth/Form: | 7800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7800 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 739, Top: , Bottom: 7800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/11/2012 | | Spud Date: | 4/7/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7815 ft. | Measured PB depth: | 7757 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL
TRIPLE COMBO | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 733 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 279, Top: 0 ft., Bottom: 733 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 2983 ft., Depth: 7802 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 2380 ft., Bottom: 7802 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3848 ft. | | | | | SUSSEX | 4433 ft. | | | | | SHANNON | 5021 ft. | | | | | NIOBRARA | 6935 ft. | | | | | CODELL | 7236 ft. | | | | | J SAND | 7641 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/19/2024 Interval Top: 7642 ft. Interval Bottom: 7697 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/15/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/16/2012 | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
PUMPED 297002# OTTAWA SAND and 9282#SB Excel DOWNHOLE in 161952gals of SilverStim/GELLED/RECYCLED/FRESH WATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7642 ft. | # Of Holes: | 120 | | Interval Bottom: | 7697 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/13/2013 Interval Top: 7237 ft. Interval Bottom: 7250 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/18/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/15/2012 | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
PUMPED 242260# OTTAWA SAND DOWNHOLE in 137928gals of 15% HCL/SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7237 ft. | # Of Holes: | 52 | | Interval Bottom: | 7250 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/25/2012 Interval Top: 7007 ft. Interval Bottom: 7697 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/18/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/25/2012 | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/25/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 56 | | BBLS_OIL | 60 | | BTU_GAS | 1283 | | CALC_BBLS_H2O | 56 | | CALC_BBLS_OIL | 60 | | CALC_GOR | 11167 | | CALC_MCF_GAS | 670 | | CASING_PRESS | 734 | | GRAVITY_OIL | 53 | | MCF_GAS | 670 |
| | Perforation Data: | | Interval Top: | 7007 ft. | # Of Holes: | 220 | | Interval Bottom: | 7697 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/19/2024 Interval Top: 7007 ft. Interval Bottom: 7250 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/18/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/13/2013 | Treatment End Date: | N/A | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7007 ft. | # Of Holes: | 100 | | Interval Bottom: | 7250 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/13/2013 Interval Top: 7007 ft. Interval Bottom: 7132 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/18/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/16/2012 | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
PUMPED 240404# OTTAWA SAND and DOWNHOLE in 164052gals of SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7007 ft. | # Of Holes: | 48 | | Interval Bottom: | 7132 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/19/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|