|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/14/2025 Measured TD: 7935 ft. Vertical TD: 7821 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/14/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/16/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 1310 FNL 50 FEL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 1310 FNL 50 FEL | | Proposed Depth/Form: | 7861 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7861 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 6755 ft., Bottom: 7861 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/18/2010 | | Spud Date: | 12/12/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7935 ft. | Measured PB depth: | 7882 ft. | | True Vertical TD: | 7821 ft. | True Vertical PB depth: | 7768 ft. | | Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 1283 FNL 75 FEL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 1280 FNL 82 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 531 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 531 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7919 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 2890 ft., Bottom: 7919 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4440 ft. | | | | | NIOBRARA | 7004 ft. | | | | | CODELL | 7306 ft. | | | | | J SAND | 7790 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/14/2025 Interval Top: 7790 ft. Interval Bottom: 7852 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/18/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND WITH 154,350 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,500 # 20/40 SAND. 12/30/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7790 ft. | # Of Holes: | 84 | | Interval Bottom: | 7852 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 2/6/2025 Interval Top: 7306 ft. Interval Bottom: 7324 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/18/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 36 | | Interval Bottom: | 7324 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 6/6/2011 Interval Top: 7004 ft. Interval Bottom: 7852 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/6/2011 | | Treatment Summary: | JSND-CDL-NBRR COMPLETION. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JNBCD. |
| | Perforation Data: | | Interval Top: | 7004 ft. | # Of Holes: | 352 | | Interval Bottom: | 7852 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/14/2025 Interval Top: 7004 ft. Interval Bottom: 7324 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/18/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2010 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7410'. 12/30/10. FRAC'D THE CODELL WITH 110,208 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,020 # 20/40 SAND. 12/30/10. SET CFP @ 7240'. 12/30/10. FRAC'D THE NIOBRARA "C" WITH 132,174 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,640 # 20/40 SAND. 12/30/10. SET CFP @ 7154'. 12/30/10. FRAC'D THE NIOBRARA "A" & "B" WITH 151,032 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,840 # 20/40 SAND. 12/30/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7004 ft. | # Of Holes: | 268 | | Interval Bottom: | 7324 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/6/2025 Interval Top: 7004 ft. Interval Bottom: 7204 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/18/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7004 ft. | # Of Holes: | 232 | | Interval Bottom: | 7204 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/14/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 04/15/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|