|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/1/2023 Measured TD: 8285 ft. Vertical TD: 8072 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/16/2012 | Prop Depth/Form: | 8333 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8333 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8333 ft. |
| | |
Wellbore Completed | Completion Date: | 9/1/2011 | Spud Date: | 8/27/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8285 ft. | Measured PB depth: | 8232 ft. | True Vertical TD: | 8072 ft. | True Vertical PB depth: | 8019 ft. | Top PZ Location: | Sec:30 Twp: 2N 68W | Footage: 1227 FSL 2498 FEL | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 1232 FSL 2504 FEL | Log Types: | CBL
NO OPEN HOLE LOGS. LOGS STOPPED AT THE TOP OF THE J-SAND AND GOT VERY STICKY, DECIDED NOT TO TRY TO GO DOWN ANY FURTHER. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 869 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 540, Top: 0 ft., Bottom: 869 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8275 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 270, Top: 6360 ft., Bottom: 8275 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5538 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 510 ft., Bottom: 5613 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3936 ft. | 4160 ft. | | | SUSSEX | 4371 ft. | 4625 ft. | | | SHANNON | 4960 ft. | 5060 ft. | | | NIOBRARA | 7410 ft. | | | | FORT HAYS | 7713 ft. | | | | CODELL | 7734 ft. | | | | J SAND | 8135 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/1/2023 Interval Top: 8170 ft. Interval Bottom: 8185 ft. Completed Information for Formation J SAND | 1st Production Date: | 11/9/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/13/2011 | Treatment Summary: | J S PERF 8170-8185 HOLES 60 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,983 gal Slickwater w/ 115,120# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8170 ft. | # Of Holes: | 60 | Interval Bottom: | 8185 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 11/9/2011 Interval Top: 7514 ft. Interval Bottom: 8185 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 11/9/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/13/2011 | Treatment Summary: | NB PERF 7514-7620 HOLES 48 SIZE 0.42
CD PERF 7736-7750 HOLES 56 SIZE 0.42
J S PERF 8170-8185 HOLES 60 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/9/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | BTU_GAS | 1155 | CALC_BBLS_OIL | 30 | CALC_GOR | 3333 | CALC_MCF_GAS | 100 | CASING_PRESS | 2500 | GRAVITY_OIL | 52 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7514 ft. | # Of Holes: | 164 | Interval Bottom: | 8185 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/1/2023 Interval Top: 7514 ft. Interval Bottom: 7750 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/9/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/21/2011 | Treatment Summary: | NB PERF 7514-7620 HOLES 48 SIZE 0.42 CD PERF 7736-7750 HOLES 56 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 243,054 gal Slickwater w/ 202,400# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 202,398 gal Slickwater w/ 150,520# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7514 ft. | # Of Holes: | 104 | Interval Bottom: | 7750 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 11/01/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|