|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/7/2024 Measured TD: 8551 ft. Vertical TD: 8017 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/7/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/16/2012 | Proposed Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 50 FNL 2640 FEL | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 50 FNL 2640 FEL | Proposed Depth/Form: | 8496 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 665, Top: , Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8496 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8496 ft. |
| | |
Wellbore Completed | Completion Date: | 2/17/2011 | Spud Date: | 2/13/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8551 ft. | Measured PB depth: | 8507 ft. | True Vertical TD: | 8017 ft. | True Vertical PB depth: | 7973 ft. | Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 65 FNL 2609 FEL | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 68 N 2635 E | Log Types: | CD-CN-ML, HRI; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 971 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 971 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8541 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 255, Top: 6716 ft., Bottom: 8541 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: 0 ft., Depth: 5782 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 510, Top: 725 ft., Bottom: 5825 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4204 ft. | 4458 ft. | | | SUSSEX | 4690 ft. | 4910 ft. | | | SHANNON | 5289 ft. | 5329 ft. | | | NIOBRARA | 7640 ft. | | | | FORT HAYS | 7922 ft. | | | | CODELL | 7944 ft. | | | | J SAND | 8374 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 5/7/2024 Interval Top: 8384 ft. Interval Bottom: 8420 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/21/2011 | Treatment Summary: | J S Perf 8384-8420 Holes 48 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 149,348 gal Slickwater w/ 115,720# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8384 ft. | # Of Holes: | 48 | Interval Bottom: | 8420 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/28/2011 Interval Top: 7686 ft. Interval Bottom: 8420 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/21/2011 | Treatment Summary: | NB Perf 7686-7828 Holes 62 Size 0.42
CD Perf 7950-7968 Holes 54 Size 0.42
J S Perf 8384-8420 Holes 48 Size 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 38 | BTU_GAS | 1249 | CALC_BBLS_OIL | 38 | CALC_GOR | 2632 | CALC_MCF_GAS | 100 | CASING_PRESS | 1400 | GRAVITY_OIL | 49 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7686 ft. | # Of Holes: | 164 | Interval Bottom: | 8420 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/7/2024 Interval Top: 7686 ft. Interval Bottom: 7968 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/26/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/21/2011 | Treatment Summary: | NB Perf 7686-7828 Holes 62 Size 0.42 CD Perf 7950-7968 Holes 54 Size 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 248,308 gal Slickwater w/ 201,020# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 209,893 gal Slickwater w/ 150,580# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7686 ft. | # Of Holes: | 116 | Interval Bottom: | 7968 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/07/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|