|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/1/2023 Measured TD: 8200 ft. Vertical TD: 8109 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/10/2012 | | Proposed Top PZ Location: | Sec:30 Twp: 2N 68W | Footage: 706 FSL 681 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 666 FSL 667 FEL | | Proposed Depth/Form: | 8217 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: S/2SE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: S/2SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8217 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8217 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/14/2011 | | Spud Date: | 8/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8200 ft. | Measured PB depth: | 8143 ft. | | True Vertical TD: | 8109 ft. | True Vertical PB depth: | 8052 ft. | | Top PZ Location: | Sec:30 Twp: 2N 68W | Footage: 706 FSL 681 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 666 FSL 667 FEL | | Log Types: | PRE FORM 5 | | Log Types: | P/E AILC-CNLD-ML-TC-CV; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 881 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 881 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8188 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6700 ft., Bottom: 8188 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5529 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 700 ft., Bottom: 5531 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3900 ft. | | | | | SUSSEX | 4422 ft. | 4590 ft. | | | | SHANNON | 4892 ft. | 4918 ft. | | | | NIOBRARA | 7340 ft. | | | | | FORT HAYS | 7613 ft. | | | | | CODELL | 7636 ft. | | | | | J SAND | 8045 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/1/2023 Interval Top: 8056 ft. Interval Bottom: 8074 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/9/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/12/2011 | | Treatment Summary: | J S PERF 8056-8074 HOLES 54 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,714 gal Slickwater w/ 116,800# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8056 ft. | # Of Holes: | 54 | | Interval Bottom: | 8074 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/7/2023 Interval Top: 7640 ft. Interval Bottom: 7654 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/14/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 56 | | Interval Bottom: | 7654 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/9/2011 Interval Top: 7426 ft. Interval Bottom: 8074 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/9/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/12/2011 | | Treatment Summary: | NB PERF 7426-7520 HOLES 40 SIZE 0.42
CD PERF 7640-7654 HOLES 56 SIZE 0.38
J S PERF 8056-8074 HOLES 54 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1155 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3333 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 2500 | | GRAVITY_OIL | 52 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 150 | | Interval Bottom: | 8074 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/1/2023 Interval Top: 7426 ft. Interval Bottom: 7654 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/14/2011 | | Treatment Summary: | NB PERF 7426-7520 HOLES 40 SIZE 0.42 CD PERF 7640-7654 HOLES 56 SIZE 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 210 gal 15% HCl & 248,682 gal Slickwater w/ 197,580# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 204,162 gal Slickwater w/ 153,120# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 108 | | Interval Bottom: | 7654 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 12/7/2023 Interval Top: 7426 ft. Interval Bottom: 7520 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 52 | | Interval Bottom: | 7520 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/01/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|