|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/26/2024 Measured TD: 8280 ft. Vertical TD: 8092 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/10/2012 | | Proposed Top PZ Location: | Sec:31 Twp: 2N 68W | Footage: 11 FNL 2489 FWL | | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 50 FSL 2500 FWL | | Proposed Depth/Form: | 8317 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8317 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8317 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/5/2011 | | Spud Date: | 9/2/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8280 ft. | Measured PB depth: | 8226 ft. | | True Vertical TD: | 8092 ft. | True Vertical PB depth: | 8038 ft. | | Top PZ Location: | Sec:31 Twp: 2N 68W | Footage: 11 FNL 2489 FWL | | Bottom Hole Location: | Sec:30 Twp: 2N 68W | Footage: 50 FSL 2500 FWL | | Log Types: | CBL
NO OPEN HOLE LOGS RUN. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 875 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 875 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8270 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6230 ft., Bottom: 8270 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5490 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 248 ft., Bottom: 5530 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3920 ft. | | | | | SUSSEX | 4350 ft. | | | | | SHANNON | 4950 ft. | | | | | NIOBRARA | 7388 ft. | | | | | FORT HAYS | 7691 ft. | | | | | CODELL | 7712 ft. | | | | | J SAND | 8130 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/26/2024 Interval Top: 8130 ft. Interval Bottom: 8144 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/9/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | J S PERF 8130-8144 HOLES 56 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 146,383 gal Slickwater w/ 144,180# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8130 ft. | # Of Holes: | 56 | | Interval Bottom: | 8144 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/23/2024 Interval Top: 7380 ft. Interval Bottom: 8144 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/9/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | NB PERF 7380-7570 HOLES 58 SIZE 0.42
CD PERF 7690-7708 HOLES 54 SIZE 0.42
J S PERF 8130-8144 HOLES 56 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1155 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3333 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 2750 | | GRAVITY_OIL | 52 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7380 ft. | # Of Holes: | 168 | | Interval Bottom: | 8144 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/26/2024 Interval Top: 7380 ft. Interval Bottom: 7708 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/24/2011 | | Treatment Summary: | NB PERF 7380-7570 HOLES 58 SIZE 0.42 CD PERF 7690-7708 HOLES 54 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 250,866 gal Slickwater w/ 202,100# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 203,826 gal Slickwater w/ 151,340# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7380 ft. | # Of Holes: | 112 | | Interval Bottom: | 7708 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|