|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/4/2019 Measured TD: 8410 ft. Vertical TD: 8117 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/4/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/10/2012 | Prop Depth/Form: | 8443 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8443 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8443 ft. |
| | |
Wellbore Completed | Completion Date: | 8/23/2011 | Spud Date: | 8/17/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8410 ft. | Measured PB depth: | 8372 ft. | True Vertical TD: | 8117 ft. | True Vertical PB depth: | 8079 ft. | Top PZ Location: | Sec:29 Twp: 2N 68W | Footage: 1376 FSL 82 FWL | Bottom Hole Location: | Sec:29 Twp: 2N 68W | Footage: 1390 FSL 85 FWL | Log Types: | PRE FORM 5 | Log Types: | CBL
NO OPEN HOLE LOGS PLANNED TO RUN ON THIS WELL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 883 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8389 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 245, Top: 6738 ft., Bottom: 8389 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 6130 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 772, Top: 300 ft., Bottom: 6130 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4175 ft. | | | | SUSSEX | 4636 ft. | | | | SHANNON | 5039 ft. | | | | NIOBRARA | 7503 ft. | | | | FORT HAYS | 7777 ft. | | | | CODELL | 7830 ft. | | | | J SAND | 8245 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/4/2019 Interval Top: 8262 ft. Interval Bottom: 8276 ft. Completed Information for Formation J SAND | 1st Production Date: | 11/9/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/12/2011 | Treatment Summary: | J S PERF 8262-8276 HOLES 56 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,924 gal Slickwater w/ 116,800# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8262 ft. | # Of Holes: | 56 | Interval Bottom: | 8276 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/9/2011 Interval Top: 7524 ft. Interval Bottom: 8276 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 11/9/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/12/2011 | Treatment Summary: | NB PERF 7524-7706 HOLES 58 SIZE 0.42
CD PERF 7824-7842 HOLES 54 SIZE 0.42
J S PERF 8262-8276 HOLES 56 SIZE 0.38 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/9/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | BTU_GAS | 1155 | CALC_BBLS_OIL | 30 | CALC_GOR | 3333 | CALC_MCF_GAS | 100 | CASING_PRESS | 1103 | GRAVITY_OIL | 52 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7524 ft. | # Of Holes: | 168 | Interval Bottom: | 8276 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/4/2019 Interval Top: 7524 ft. Interval Bottom: 7842 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/9/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/19/2011 | Treatment Summary: | NB PERF 7524-7706 HOLES 58 SIZE 0.42 CD PERF 7824-7842 HOLES 54 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 244,944 gal Slickwater w/ 200,260# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 211,107 gal Slickwater w/ 150,320# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7524 ft. | # Of Holes: | 112 | Interval Bottom: | 7842 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 10/04/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|