|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2026 Measured TD: 8176 ft. Vertical TD: 8066 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/8/2012 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 1300 FSL 50 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 1300 FSL 50 FEL | | Proposed Depth/Form: | 8611 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8611 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7384 ft., Bottom: 8611 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/21/2010 | | Spud Date: | 7/16/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8176 ft. | Measured PB depth: | 8133 ft. | | True Vertical TD: | 8066 ft. | True Vertical PB depth: | 8023 ft. | | Top PZ Location: | Sec:8 Twp: 2N 67W | Footage: 1261 FSL 100 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 1255 FSL 138 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 829 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 0 ft., Bottom: 829 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8160 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6570 ft., Bottom: 8160 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4200 ft., Depth: 5276 ft., Bottom: 5284 ft., Sacks: 150, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4454 ft. | | | | | NIOBRARA | 7310 ft. | | | | | CODELL | 7570 ft. | | | | | J SAND | 8004 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 1/1/2026 Interval Top: 8004 ft. Interval Bottom: 8034 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/2/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC THE J-SAND WITH 155,442 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,740 # 20/40 SAND. 08/02/2010 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8004 ft. | # Of Holes: | 48 | | Interval Bottom: | 8034 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/14/2010 Interval Top: 7358 ft. Interval Bottom: 8034 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/14/2010 | | Treatment Summary: | JSND-CDL-NBRR-COMMINGLE. SET CBP @ 7260'. 08/05/2010. DRILLED OUT CBP @ 7260', 7460' TO COMMINGLE THE JSND-CDL-NBRR, 08/06/2010. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7994 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/14/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 56 | | BBLS_OIL | 38 | | CALC_BBLS_H2O | 56 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 9816 | | CALC_MCF_GAS | 373 | | CASING_PRESS | 1302 | | MCF_GAS | 373 | | TUBING_PRESS | 675 |
| | Perforation Data: | | Interval Top: | 7358 ft. | # Of Holes: | 164 | | Interval Bottom: | 8034 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 1/1/2026 Interval Top: 7358 ft. Interval Bottom: 7588 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/2/2010 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7660'. 08/02/2010. FRAC'D THE CODELL WITH 110,250 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,040 # 20/40 SAND. 08/02/2010. SET CFP @ 7460'. 08/02/2010. FRAC'D THE NIOBRARA WITH 131,418 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,990 # 20/40 SAND. 08/02/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7358 ft. | # Of Holes: | 116 | | Interval Bottom: | 7588 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 32 |
| Total Gas Produced (MCF) | 1713 |
| GOR | 53531 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.774 |
| Average MCFE per Day | 4.487 |
| Federal Financial Assurance | i | |
|
|