|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2026 Measured TD: 8200 ft. Vertical TD: 8113 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/3/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 94 FSL 1159 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 67W | Footage: 97 FSL 1143 FWL | | Proposed Depth/Form: | 8103 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 790 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 790 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8155 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7112 ft., Bottom: 8155 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/1/2010 | | Spud Date: | 6/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8200 ft. | Measured PB depth: | 7832 ft. | | True Vertical TD: | 8113 ft. | True Vertical PB depth: | 7745 ft. | | Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 94 FSL 1159 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 67W | Footage: 97 FSL 1143 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 813 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 813 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8185 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 3530 ft., Bottom: 8185 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4502 ft. | | | | | NIOBRARA | 7360 ft. | | | | | CODELL | 7588 ft. | | | | | J SAND | 8020 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 8020 ft. Interval Bottom: 8056 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/19/2010 | | Treatment Summary: | FRACD WITH 153678 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250280# 20/40 SAND. 07/19/2010 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8020 ft. | # Of Holes: | 52 | | Interval Bottom: | 8056 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/8/2010 Interval Top: 7408 ft. Interval Bottom: 8056 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/8/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE
SET CBP @ 7315; 8/2/10. DRILLED OUT CBP @ 7315; CFP @ 7500 AND 7710 TO COMMINGLE THE JSND-NBRR-CDL 8/3/10. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8010 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/8/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 68 | | BBLS_OIL | 53 | | CALC_BBLS_H2O | 68 | | CALC_BBLS_OIL | 53 | | CALC_GOR | 5358 | | CALC_MCF_GAS | 284 | | CASING_PRESS | 1060 | | MCF_GAS | 284 | | TUBING_PRESS | 510 |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 172 | | Interval Bottom: | 8056 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 7408 ft. Interval Bottom: 7608 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/19/2010 | | Treatment Summary: | SET CFP @ 7710. 07/19/2010. FRACD THE CODELL WITH 109620 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250100# 20/40 SAND. 07/19/2010. SET CFP @ 7500. 07/19/2010. FRAC'D THE NIOBRARA WITH 133938 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250580# 20/40 SAND. 07/19/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 120 | | Interval Bottom: | 7608 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 173 |
| Total Gas Produced (MCF) | 4474 |
| GOR | 25861 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.474 |
| Average MCFE per Day | 14.352 |
| Federal Financial Assurance | i | |
|
|