Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31700
Well Classification: GW Status: PA - 5/22/2019
Well Name/No:ECHEVERRIA #0-2-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/22/2019
FacilityID:417601LocationID:330769
County:WELD #123Location:NENW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4855 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:898FNL  1899 FWLLat/Long: 40.171960 / -104.860180Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.171967 / -104.860192Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/1/2012
End Date: 10/1/2012
Reported: 1/31/2013
Days to report: 122
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/22/2019             Measured TD: 8292 ft.    Vertical TD: 7947 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/22/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/24/2014
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 1157 FNL  41 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67W Footage: 1161 FNL  46 FWL
Proposed Depth/Form:8264 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 7223 ft., Bottom: 8264 ft.

Wellbore Completed
Completion Date:9/11/2012
Spud Date:9/7/2012Spud Date Is:ACTUAL
Measured TD:8292 ft.Measured PB depth:8240 ft.
True Vertical TD:7947 ft.True Vertical PB depth:7895 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 1157 FNL  41 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 1161 FNL  46 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8281 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 3270 ft., Bottom: 8281 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4548 ft.
NIOBRARA7447 ft.
CODELL7701 ft.
J SAND8141 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/22/2019                 Interval Top: 8144 ft.    Interval Bottom: 8185 ft.

 Completed Information for Formation J SAND
1st Production Date:2/15/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/27/2012Treatment End Date:11/6/2012
Treatment Summary:Frac'd the J-Sand 8144-8149, 8165-8185, (50 holes)w/ 64,512 gal 18 # Vistar Hybrid cross linked gel containing 250,580 # 20/40 Sand. 10-01-12
Total fluid used in treatment (bbls):3820Max pressure during treatment (psi):3620
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.52
Recycled water used in treatment (bbls):3820Total flowback volume recovered (bbls):209
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8144 ft.# Of Holes:50
Interval Bottom:8185 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/12/2013                 Interval Top: 7703 ft.    Interval Bottom: 7717 ft.

 Completed Information for Formation CODELL
1st Production Date:2/15/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/27/2012Treatment End Date:11/6/2012
Treatment Summary:Set CFP @ 7760'. 10-01-12 Frac'd the Codell 7,703'-7,717’ (42 holes) w/ 88,830 gal 22# Vistar Hybrid cross linked gel containing 251,720 # 30/50 sand. 10-01-12
Total fluid used in treatment (bbls):2718Max pressure during treatment (psi):4837
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):2718Total flowback volume recovered (bbls):209
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7703 ft.# Of Holes:42
Interval Bottom:7717 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/19/2013                 Interval Top: 7492 ft.    Interval Bottom: 8185 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/15/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:2/19/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7450'. 11-03-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 11-06-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8111 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/19/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 108
CALC_BBLS_H2O 36
CALC_BBLS_OIL 108
CALC_GOR 7898
CALC_MCF_GAS 853
CASING_PRESS 1239
MCF_GAS 853
TUBING_PRESS 713
Perforation Data:
Interval Top:7492 ft.# Of Holes:140
Interval Bottom:8185 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/22/2019                 Interval Top: 7492 ft.    Interval Bottom: 7717 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/15/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7492 ft.# Of Holes:90
Interval Bottom:7717 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/12/2013                 Interval Top: 7492 ft.    Interval Bottom: 7504 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/27/2012Treatment End Date:11/6/2012
Treatment Summary:Set CFP @ 7554'. 10-01-12 Frac'd the Niobrara 7492-7504’, (48 holes), w/ 96,600 gals 18 # Vistar Hybrid cross linked gel containing 250,540 # 30/50 sand. 10-01-12
Total fluid used in treatment (bbls):3193Max pressure during treatment (psi):4186
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):3193Total flowback volume recovered (bbls):209
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250540Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7492 ft.# Of Holes:48
Interval Bottom:7504 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/22/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No