|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/29/2018 Measured TD: 8610 ft. Vertical TD: 8151 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/29/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/26/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 16 FNL 47 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 27 FNL 54 FEL | | Proposed Depth/Form: | 8543 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1130 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 770, Top: , Bottom: 1130 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8543 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8543 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/23/2010 | | Spud Date: | 10/19/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8610 ft. | Measured PB depth: | 8557 ft. | | True Vertical TD: | 8151 ft. | True Vertical PB depth: | 8098 ft. | | Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 16 FNL 47 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 27 FNL 54 FEL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | CD-CN-ML, DI-GL-GR, PERF LOG, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1172 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 1172 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8594 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1070, Top: 2000 ft., Bottom: 8594 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4605 ft. | | | | | SUSSEX | 5149 ft. | | | | | NIOBRARA | 7660 ft. | | | | | FORT HAYS | 7975 ft. | | | | | CODELL | 8000 ft. | | | | | J SAND | 8440 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 8452 ft. Interval Bottom: 8476 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/10/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/19/2010 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 141,406 gal Slickwater w/ 115,860# 40/70 & 4,080# 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1241 | | CALC_MCF_GAS | 2 | | CASING_PRESS | 150 | | GRAVITY_OIL | 47 | | MCF_GAS | 2 |
| | Perforation Data: | | Interval Top: | 8452 ft. | # Of Holes: | 42 | | Interval Bottom: | 8476 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/31/2018 Interval Top: 7764 ft. Interval Bottom: 8020 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/1/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/10/2010 | | Treatment Summary: | NB Perf 7764-7860 Holes 60 Size 0.38 CD Perf 8000-8020 Holes 60 Size 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 239,738 gal Slickwater w/ 201,300# 40/70, 4,320# SB Excel
Frac Codell down 4-1/2" Csg w/ 200,214 gal Slickwater w/ 150,500# 40/70, 4,220# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 26 | | BTU_GAS | 1241 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 6308 | | CALC_MCF_GAS | 164 | | CASING_PRESS | 150 | | GRAVITY_OIL | 47 | | MCF_GAS | 164 |
| | Perforation Data: | | Interval Top: | 7764 ft. | # Of Holes: | 120 | | Interval Bottom: | 8020 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/31/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|