Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31684
Well Classification: OW Status: PA - 5/29/2018
Well Name/No:HIGHWAY 160 #1-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/29/2018
FacilityID:417526LocationID:317936
County:WELD #123Location:SWNE 2 1N66W 6
Field:WATTENBERG - #90750Elevation:5104 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1496FNL  1579 FELLat/Long: 40.083254 / -104.740482Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.083264 / -104.740492Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/12/2011
End Date: 1/12/2011
Reported: 5/10/2011
Prior to rule 205A.b.(2)(A)
Days to report: 118
Disclosure: Sidetrack #00
Start Date: 5/17/2012
End Date: 5/17/2012
Reported: 6/27/2012
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/29/2018             Measured TD: 8550 ft.    Vertical TD: 8368 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/29/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/26/2012
Proposed Top PZ Location:Sec:2 Twp: 1N 66W Footage: 772 FNL  519 FEL
Bottom Hole Location:Sec:2 Twp: 1N 66W Footage: 779 FNL  516 FEL
Proposed Depth/Form:8555 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1130 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 770, Top: , Bottom: 1130 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8555 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8555 ft.
Casing:String Type: 1ST LINER, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/27/2010
Spud Date:10/23/2010Spud Date Is:ACTUAL
Measured TD:8550 ft.Measured PB depth:8502 ft.
True Vertical TD:8368 ft.True Vertical PB depth:8320 ft.
Top PZ Location:Sec:2 Twp: 1N 66WFootage: 772 FNL  519 FEL
Bottom Hole Location:Sec:2 Twp: 1N 66WFootage: 779 FNL  516 FEL
Log Types:PRELIMINARY FORM 5
Log Types:CD-CN-ML, DI-GL-GR; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1179 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 0 ft., Bottom: 1179 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8540 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1035, Top: 1354 ft., Bottom: 8540 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4423 ft.
SUSSEX4824 ft.
NIOBRARA7386 ft.
FORT HAYS7690 ft.
CODELL7714 ft.
J SAND8164 ft.
DAKOTA8355 ft.

Formation DKTA                     Formation Classification:  OW                     Status:  AB - 5/29/2018                 Interval Top: 8358 ft.    Interval Bottom: 8384 ft.

 Completed Information for Formation DAKOTA
1st Production Date:2/16/2011Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2012Treatment End Date:N/A
Treatment Summary:SET CIBP 8318 WITH CMT CAP - 2 SKS OF CMT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/12/2011
Treatment Summary:Frac Dakota down 2-7/8" Tbg w/ Pkr w/ 44,906 gal Vistar w/ 9,260# 100 Mesh , 44,560# 20/40 Ottawa & 11,420# 20/40.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1307
CALC_BBLS_OIL 10
CALC_GOR 3100
CALC_MCF_GAS 31
CASING_PRESS 1500
GRAVITY_OIL 47
MCF_GAS 31
TUBING_PRESS 1500
Perforation Data:
Interval Top:8358 ft.# Of Holes:52
Interval Bottom:8384 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/12/2012                Interval Top: 7716 ft.    Interval Bottom: 7732 ft.

 Completed Information for Formation CODELL
1st Production Date:5/23/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2012
Treatment Summary:PERF CODL 7716-7732 HOLES 64 SIZE .38 Frac CODL down 4.5" casing w/ 206,304 gal slickwater w/ 149,940# 40/70, 4,460# 20/40. Broke @ 3,881 psi @ 5.8 bpm. ATP=4,653 psi; MTP=5,185 psi; ATR=61.1 bpm; ISDP=2,865 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7716 ft.# Of Holes:64
Interval Bottom:7732 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/29/2018                 Interval Top: 7386 ft.    Interval Bottom: 7732 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/22/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 130
BTU_GAS 1184
CALC_BBLS_OIL 130
CALC_GOR 762
CALC_MCF_GAS 99
CASING_PRESS 609
GRAVITY_OIL 46
MCF_GAS 99
Perforation Data:
Interval Top:7386 ft.# Of Holes:184
Interval Bottom:7732 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/12/2012                Interval Top: 7386 ft.    Interval Bottom: 7532 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/23/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2012
Treatment Summary:PERF NBRR 7386-7532 HOLES 120 SIZE .42 Frac NBRR down 4.5" casing w/ 252 gal 15% HCl & 251,286 gal slickwater w/ 200,320# 40/70, 4,060# 20/40. Broke @ 3,142 psi @ 5 bpm. ATP=4,528 psi; MTP=4,866 psi; ATR=60.9 bpm; ISDP=2,912 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7386 ft.# Of Holes:120
Interval Bottom:7532 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/29/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No