|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/29/2018 Measured TD: 8385 ft. Vertical TD: 8154 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/29/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/26/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 1285 FNL 66 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 1280 FNL 76 FEL | | Proposed Depth/Form: | 8395 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1130 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 770, Top: , Bottom: 1130 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8395 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8395 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/31/2010 | | Spud Date: | 10/28/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8385 ft. | Measured PB depth: | 8335 ft. | | True Vertical TD: | 8154 ft. | True Vertical PB depth: | 8104 ft. | | Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 1285 FNL 66 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 1280 FNL 76 FEL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | GR-CCL-CB-VDL, CD-CN-ML, DI-GL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1149 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1149 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8371 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1070, Top: 464 ft., Bottom: 8371 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4490 ft. | | | | | SUSSEX | 4897 ft. | | | | | NIOBRARA | 7486 ft. | | | | | FORT HAYS | 7745 ft. | | | | | CODELL | 7768 ft. | | | | | J SAND | 8233 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 5/29/2018 Interval Top: 8223 ft. Interval Bottom: 8247 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/7/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/16/2010 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 141,750 gal Slickwater w/ 115,020# 40/70, 4,520# SB Excel.
This 5A is being filed to update the 5A document #400140399 filed on 03/08/2011 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8223 ft. | # Of Holes: | 60 | | Interval Bottom: | 8247 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/17/2011 Interval Top: 7548 ft. Interval Bottom: 8235 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/7/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | NB PERF 7548-7638 HOLES 66 SIZE .42
CD PERF 7766-7782 HOLES 64 SIZE .38
JSND PERF 8223-8235 HOLES 60 SIZE .38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/17/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 43 | | BTU_GAS | 1241 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 1070 | | CALC_MCF_GAS | 46 | | CASING_PRESS | 1350 | | GRAVITY_OIL | 43 | | MCF_GAS | 46 |
| | Perforation Data: | | Interval Top: | 7548 ft. | # Of Holes: | 190 | | Interval Bottom: | 8235 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 5/29/2018 Interval Top: 7548 ft. Interval Bottom: 7782 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/7/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/13/2010 | | Treatment Summary: | Frac Codell down 4-1/2" Csg w/ 198,694 gal Slickwater w/ 150,850# 40/70, 4,260# SB Excel.
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,978 gal Slickwater w/ 201,140# 40/70, 4,240# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7548 ft. | # Of Holes: | 130 | | Interval Bottom: | 7782 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/29/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|