|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/18/2018 Measured TD: 8295 ft. Vertical TD: 8210 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/18/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/25/2012 | Proposed Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 510 FNL 660 FWL | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 510 FNL 660 FWL | Proposed Depth/Form: | 8494 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2NW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 770, Top: , Bottom: 1110 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8494 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8494 ft. |
| | |
Wellbore Completed | Completion Date: | 12/19/2010 | Spud Date: | 12/14/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8295 ft. | Measured PB depth: | 8240 ft. | True Vertical TD: | 8210 ft. | True Vertical PB depth: | 8155 ft. | Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 513 FNL 641 FWL | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 509 N 646 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | P/E AILC-CNDL-CV/C-TC-BCS; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1126 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8271 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1110, Top: 2534 ft., Bottom: 8271 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4445 ft. | 4573 ft. | | | SUSSEX | 4774 ft. | 4933 ft. | | | NIOBRARA | 7361 ft. | | | | CODELL | 7685 ft. | | | | J SAND | 8128 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/18/2018 Interval Top: 8134 ft. Interval Bottom: 8162 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/25/2011 | Treatment Summary: | J S Perf 8134-8162 Holes 60 Size 0.38
Frac J-Sand down 4-1/2" Csg w/ 149,226 gal Slickwater w/ 115,280# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8134 ft. | # Of Holes: | 60 | Interval Bottom: | 8162 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/14/2011 Interval Top: 7362 ft. Interval Bottom: 8162 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/25/2011 | Treatment Summary: | NB Perf 7362-7552 Holes 62 Size 0.38
CD Perf 7685-7699 Holes 56 Size 0.42
J S Perf 8134-8162 Holes 60 Size 0.38 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8097 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 10 | BTU_GAS | 1116 | CALC_BBLS_OIL | 10 | CALC_GOR | 4500 | CALC_MCF_GAS | 45 | CASING_PRESS | 1320 | GRAVITY_OIL | 44 | MCF_GAS | 45 |
| Perforation Data: | Interval Top: | 7362 ft. | # Of Holes: | 178 | Interval Bottom: | 8162 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/18/2018 Interval Top: 7362 ft. Interval Bottom: 7699 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/11/2011 | Treatment Summary: | NB Perf 7362-7552 Holes 62 Size 0.38 CD Perf 7685-7699 Holes 56 Size 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 249,488 gal Slickwater w/ 200,900# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 205,663 gal Slickwater w/ 150,140# 40/70, 4,000# SuperLC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7362 ft. | # Of Holes: | 118 | Interval Bottom: | 7699 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 06/18/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|