|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/18/2018 Measured TD: 8310 ft. Vertical TD: 8177 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/18/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/25/2012 | Proposed Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 1265 FNL 50 FWL | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 1265 FNL 50 FWL | Proposed Depth/Form: | 8321 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 1/10/2011 | Spud Date: | 1/6/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8310 ft. | Measured PB depth: | 8047 ft. | True Vertical TD: | 8177 ft. | True Vertical PB depth: | 7914 ft. | Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 1258 FNL 54 FWL | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 1260 N 63 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | SB-GR-CCL, HRI, CD-CN-ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1123 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1123 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8298 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 245, Top: 6444 ft., Bottom: 8298 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5274 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 620, Top: 318 ft., Bottom: 5328 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5274 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 620, Top: 318 ft., Bottom: 5328 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4776 ft. | | | | NIOBRARA | 7400 ft. | | | | FORT HAYS | 7706 ft. | | | | CODELL | 7728 ft. | | | | J SAND | 8177 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/18/2018 Interval Top: 8184 ft. Interval Bottom: 8222 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/24/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 266,742 gal Slickwater w/ 115,020# 40/70, 4,000# SuperLC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8184 ft. | # Of Holes: | 60 | Interval Bottom: | 8222 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/28/2011 Interval Top: 7500 ft. Interval Bottom: 8222 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 63 | BTU_GAS | 1116 | CALC_BBLS_OIL | 63 | CALC_GOR | 13270 | CALC_MCF_GAS | 836 | CASING_PRESS | 839 | GRAVITY_OIL | 44 | MCF_GAS | 836 |
| Perforation Data: | Interval Top: | 7500 ft. | # Of Holes: | 184 | Interval Bottom: | 8222 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/18/2018 Interval Top: 7500 ft. Interval Bottom: 7746 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/31/2011 | Treatment Summary: | NB PERF 7500-7596 HOLES 60 SIZE .42 CD PERF 7730-7746 HOLES 64 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 242,287 gal Slickwater w/ 200,460# 40/70, 4,000# SuperLC.
Frac Codell down 4-1/2" Csg w/ 194,242 gal Slickwater w/ 150,240# 40/70, 4,000# SuperLC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7500 ft. | # Of Holes: | 124 | Interval Bottom: | 7746 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 06/18/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|