|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/21/2014 Measured TD: 8360 ft. Vertical TD: 8204 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/21/2014 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/25/2012 | Proposed Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 1265 FNL 2590 FWL | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 1265 FNL 2590 FWL | Proposed Depth/Form: | 8405 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 770, Top: , Bottom: 1110 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8405 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8405 ft. |
| | |
Wellbore Completed | Completion Date: | 11/27/2010 | Spud Date: | 11/23/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8360 ft. | Measured PB depth: | 8304 ft. | True Vertical TD: | 8204 ft. | True Vertical PB depth: | 8148 ft. | Top PZ Location: | Sec:2 Twp: 1N 66W | Footage: 1222 FNL 2557 FWL | Bottom Hole Location: | Sec:2 Twp: 1N 66W | Footage: 1206 N 2561 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | CD-CN-ML, DI-GL-GR; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1131 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1131 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8349 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1075, Top: 2710 ft., Bottom: 7335 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4833 ft. | | | | NIOBRARA | 7483 ft. | | | | FORT HAYS | 7720 ft. | | | | CODELL | 7742 ft. | | | | J SAND | 8203 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/15/2014 Interval Top: 8202 ft. Interval Bottom: 8242 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/1/2011 | Treatment Summary: | J S Perf 8202-8242 Holes 60 Size 0.38
Frac J-Sand down 4-1/2" Csg w/ 146,903 gal Slickwater w/ 115,020# 40/70, 4,000# SuperLC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8202 ft. | # Of Holes: | 60 | Interval Bottom: | 8242 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/15/2014 Interval Top: 7582 ft. Interval Bottom: 8242 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/1/2011 | Treatment Summary: | NB Perf 7582-7608 Holes 60 Size 0.38
CD Perf 7744-7760 Holes 64 Size 0.42
J S Perf 8202-8242 Holes 60 Size 0.38 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 10 | BTU_GAS | 1116 | CALC_BBLS_OIL | 10 | CALC_GOR | 10000 | CALC_MCF_GAS | 100 | CASING_PRESS | 818 | GRAVITY_OIL | 44 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7582 ft. | # Of Holes: | 184 | Interval Bottom: | 8242 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/15/2014 Interval Top: 7582 ft. Interval Bottom: 7760 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/13/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/14/2011 | Treatment Summary: | NB Perf 7582-7608 Holes 60 Size 0.38 CD Perf 7744-7760 Holes 64 Size 0.42
Frac Niobrara C down 4-1/2" Csg w/ 250 gal 15% HCl & 239,906 gal Slickwater w/ 200,340# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 198,618 gal Slickwater w/ 150,260# 40/70, 4,000# SuperLC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7582 ft. | # Of Holes: | 124 | Interval Bottom: | 7760 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/15/2014 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|