Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31611
Well Classification: OW Status: PA - 8/19/2024
Well Name/No:DRY CREEK #21-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/19/2024
FacilityID:417203LocationID:305214
County:WELD #123Location:NENE 27 1N67W 6
Field:SPINDLE - #77900Elevation:4993 ft.
Planned Location:473FNL  822 FELLat/Long: 40.028060 / -104.870200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.028056 / -104.870197Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2011
End Date: 1/10/2011
Reported: 3/31/2011
Prior to rule 205A.b.(2)(A)
Days to report: 80
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/19/2024             Measured TD: 8310 ft.    Vertical TD: 7905 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/19/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/12/2012
Proposed Top PZ Location:Sec:27 Twp: 1N 67W Footage: 1342 FNL  2562 FWL
Bottom Hole Location:Sec:27 Twp: 1N 67W Footage: 1360 FNL  2561 FWL
Proposed Depth/Form:8376 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 805, Top: , Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8376 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8376 ft.

Wellbore Completed
Completion Date:11/22/2010
Spud Date:11/17/2010Spud Date Is:ACTUAL
Measured TD:8310 ft.Measured PB depth:8265 ft.
True Vertical TD:7905 ft.True Vertical PB depth:7860 ft.
Top PZ Location:Sec:27 Twp: 1N 67WFootage: 1342 FNL  2562 FWL
Bottom Hole Location:Sec:27 Twp: 1N 67WFootage: 1360 N  2561 W
Log Types:PRELIMINARY FORM 5
Log Types:P/E AILC-CNLD-ML-TC-CV; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1175 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 0 ft., Bottom: 1175 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8297 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 1400 ft., Bottom: 8297 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5010 ft.
NIOBRARA7748 ft.
FORT HAYS8108 ft.
CODELL8130 ft.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/19/2024                 Interval Top: 7756 ft.    Interval Bottom: 8149 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/27/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/10/2011
Treatment Summary:NB Perf 7756-8012 Holes 64 Size 0.42 CD Perf 8131-8149 Holes 54 Size 0.38 Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 245,738 gal Slickwater w/ 200,380# 40/70, 4,000# SuperLC. Frac Codell down 4-1/2" Csg w/ 209,351 gal Slickwater w/ 150,420# 40/70, 4,000# SuperLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/2/2011Test Method:FLOWING
Hours Tested:0Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1278
CALC_BBLS_OIL 3
CASING_PRESS 1700
GRAVITY_OIL 51
Perforation Data:
Interval Top:7756 ft.# Of Holes:118
Interval Bottom:8149 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/19/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No