|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/8/2019 Measured TD: 8165 ft. Vertical TD: 7946 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/8/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/11/2012 | Proposed Top PZ Location: | Sec:27 Twp: 1N 67W | Footage: 1315 FSL 2580 FEL | Bottom Hole Location: | Sec:27 Twp: 1N 67W | Footage: 1315 FSL 2580 FEL | Proposed Depth/Form: | 8152 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8152 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8152 ft. |
| | |
Wellbore Completed | Completion Date: | 12/10/2010 | Spud Date: | 12/7/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8165 ft. | Measured PB depth: | 8125 ft. | True Vertical TD: | 7946 ft. | True Vertical PB depth: | 7906 ft. | Top PZ Location: | Sec:27 Twp: 1N 67W | Footage: 1282 FSL 2581 FEL | Bottom Hole Location: | Sec:27 Twp: 1N 67W | Footage: 1281 FSL 2580 FEL | Log Types: | PRELIMINARY FORM 5 | Log Types: | P/E AILC-CNLD-ML-CV-TC; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1196 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 0 ft., Bottom: 1196 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8155 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 960, Top: 1000 ft., Bottom: 8155 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7590 ft. | | | | CODELL | 8000 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 11/28/2011 Interval Top: 8000 ft. Interval Bottom: 8020 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/28/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/2011 | Treatment Summary: | NB REC | Formation Treatment | Treatment Date: | 2/7/2011 | Treatment Summary: | Frac Codell down 4-1/2" Csg w/ 205,254 gal Slickwater w/ 150,040# 30/50, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 32 | BTU_GAS | 1224 | CALC_BBLS_OIL | 32 | CALC_GOR | 1781 | CALC_MCF_GAS | 57 | CASING_PRESS | 1375 | GRAVITY_OIL | 54 | MCF_GAS | 57 |
| Perforation Data: | Interval Top: | 8000 ft. | # Of Holes: | 60 | Interval Bottom: | 8020 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/8/2019 Interval Top: 7590 ft. Interval Bottom: 8020 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/1/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/2011 | Treatment Summary: | NB REC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/22/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 29 | BTU_GAS | 1394 | CALC_BBLS_OIL | 29 | CALC_GOR | 2276 | CALC_MCF_GAS | 66 | CASING_PRESS | 1094 | GRAVITY_OIL | 48 | MCF_GAS | 66 |
| Perforation Data: | Interval Top: | 7590 ft. | # Of Holes: | 124 | Interval Bottom: | 8020 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/28/2011 Interval Top: 7590 ft. Interval Bottom: 7861 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/1/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/2011 | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 243,936 gal Slickwater w/ 201,020# 40/70, 4,000# SuperLC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7590 ft. | # Of Holes: | 64 | Interval Bottom: | 7861 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/08/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|