Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31593
Well Classification: OW Status: PA - 7/8/2019
Well Name/No:DRY CREEK #23-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/8/2019
FacilityID:417172LocationID:319174
County:WELD #123Location:SESE 27 1N67W 6
Field:WATTENBERG - #90750Elevation:5044 ft.
Planned Location:1036FSL  1104 FELLat/Long: 40.017700 / -104.871170Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017714 / -104.871184Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/7/2011
End Date: 2/7/2011
Reported: 6/9/2011
Prior to rule 205A.b.(2)(A)
Days to report: 122
Disclosure: Sidetrack #00
Start Date: 10/18/2011
End Date: 10/18/2011
Reported: 12/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/8/2019             Measured TD: 8165 ft.    Vertical TD: 7946 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/8/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/11/2012
Proposed Top PZ Location:Sec:27 Twp: 1N 67W Footage: 1315 FSL  2580 FEL
Bottom Hole Location:Sec:27 Twp: 1N 67W Footage: 1315 FSL  2580 FEL
Proposed Depth/Form:8152 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 805, Top: , Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8152 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8152 ft.

Wellbore Completed
Completion Date:12/10/2010
Spud Date:12/7/2010Spud Date Is:ACTUAL
Measured TD:8165 ft.Measured PB depth:8125 ft.
True Vertical TD:7946 ft.True Vertical PB depth:7906 ft.
Top PZ Location:Sec:27 Twp: 1N 67WFootage: 1282 FSL  2581 FEL
Bottom Hole Location:Sec:27 Twp: 1N 67WFootage: 1281 FSL  2580 FEL
Log Types:PRELIMINARY FORM 5
Log Types:P/E AILC-CNLD-ML-CV-TC; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1196 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1196 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8155 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 1000 ft., Bottom: 8155 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7590 ft.
CODELL8000 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/28/2011                Interval Top: 8000 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation CODELL
1st Production Date:2/28/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/18/2011
Treatment Summary:NB REC
Formation Treatment
Treatment Date:2/7/2011
Treatment Summary:Frac Codell down 4-1/2" Csg w/ 205,254 gal Slickwater w/ 150,040# 30/50, 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 32
BTU_GAS 1224
CALC_BBLS_OIL 32
CALC_GOR 1781
CALC_MCF_GAS 57
CASING_PRESS 1375
GRAVITY_OIL 54
MCF_GAS 57
Perforation Data:
Interval Top:8000 ft.# Of Holes:60
Interval Bottom:8020 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/8/2019                  Interval Top: 7590 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/1/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/18/2011
Treatment Summary:NB REC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 29
BTU_GAS 1394
CALC_BBLS_OIL 29
CALC_GOR 2276
CALC_MCF_GAS 66
CASING_PRESS 1094
GRAVITY_OIL 48
MCF_GAS 66
Perforation Data:
Interval Top:7590 ft.# Of Holes:124
Interval Bottom:8020 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/28/2011                Interval Top: 7590 ft.    Interval Bottom: 7861 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/1/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/18/2011
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 243,936 gal Slickwater w/ 201,020# 40/70, 4,000# SuperLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7590 ft.# Of Holes:64
Interval Bottom:7861 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/08/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No