|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/22/2024 Measured TD: 7280 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/22/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/11/2012 | | Proposed Depth/Form: | 7240 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 226, Top: 0 ft., Bottom: 525 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7240 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 657, Top: , Bottom: 7240 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/28/2012 | | Spud Date: | 2/25/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7280 ft. | Measured PB depth: | 7226 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GRL/CCL, CDL/CNL/ML, HRIL. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 837 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 336, Top: 0 ft., Bottom: 837 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 7270 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 552, Top: 2150 ft., Bottom: 7270 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4264 ft. | | | | | SHANNON | 4779 ft. | | | | | NIOBRARA | 6745 ft. | | | | | FORT HAYS | 7052 ft. | | | | | CODELL | 7078 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 11/7/2012 Interval Top: 7078 ft. Interval Bottom: 7094 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2012 | | Treatment Summary: | Frac'd the Codell w/ 118350 gals of Silverstim and Slick Water 15% HCI with 246,400#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7078 ft. | # Of Holes: | 64 | | Interval Bottom: | 7094 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/27/2023 Interval Top: 6767 ft. Interval Bottom: 7094 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 35 | | BTU_GAS | 1227 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 12800 | | CALC_MCF_GAS | 448 | | CASING_PRESS | 420 | | GRAVITY_OIL | 60 | | MCF_GAS | 448 |
| | Perforation Data: | | Interval Top: | 6767 ft. | # Of Holes: | 112 | | Interval Bottom: | 7094 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/7/2012 Interval Top: 6767 ft. Interval Bottom: 6909 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/26/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2012 | | Treatment Summary: | Frac'd the Niobrara w/ 158928 gals of Silverstim and Slick Water with 250,460#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6767 ft. | # Of Holes: | 48 | | Interval Bottom: | 6909 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/22/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/12/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|