|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/14/2019 Measured TD: 8442 ft. Vertical TD: 8359 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/14/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/10/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 1350 FSL 1360 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 1350 FSL 1360 FEL | | Proposed Depth/Form: | 8418 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE OF SEC 5 1N 68W | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 OF SEC 5 1N 68W | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE OF SEC. 5 1N 68W | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8418 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7290 ft., Bottom: 8418 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/2/2011 | | Spud Date: | 4/28/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8442 ft. | Measured PB depth: | 8389 ft. | | True Vertical TD: | 8359 ft. | True Vertical PB depth: | 8306 ft. | | Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 1351 FSL 1369 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 1370 FSL 1350 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1083 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1083 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8422 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 3510 ft., Bottom: 8422 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4594 ft. | | | | | NIOBRARA | 7522 ft. | | | | | CODELL | 7868 ft. | | | | | J SAND & SHANNON | 8294 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 12/14/2019 Interval Top: 8308 ft. Interval Bottom: 8328 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/6/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC’D THE J-SAND WITH 171,148 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,452# 20/40 SAND. 06/04/11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8308 ft. | # Of Holes: | 40 | | Interval Bottom: | 8328 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/26/2011 Interval Top: 7628 ft. Interval Bottom: 8328 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/26/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP@ 7580’. 06/20/11. DRILLED OUT CBP@ 7580’, CFP @ 7750’ AND 8000’ TO COMMINGLE THE JSND-CDL-NBRR. 06/21/11
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8294 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 64 | | BBLS_OIL | 84 | | BTU_GAS | 1175 | | CALC_BBLS_H2O | 64 | | CALC_BBLS_OIL | 84 | | CALC_GOR | 2226 | | CALC_MCF_GAS | 187 | | CASING_PRESS | 1958 | | GRAVITY_OIL | 40 | | MCF_GAS | 187 | | TUBING_PRESS | 1020 |
| | Perforation Data: | | Interval Top: | 7628 ft. | # Of Holes: | 152 | | Interval Bottom: | 8328 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/14/2019 Interval Top: 7628 ft. Interval Bottom: 7888 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/11/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP@8000’. 06-10-11. FRAC’D THE CODELL 7868’-7888’ (40 HOLES) W/112,560 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 263,040# 20/40 SAND. 06-11-11
SET CFP@7700’. 05-10-11. FRAC’D THE NIOBRARA 7628’-7646’, (72 HOLES) W/132,040 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 243,176# 20/40 SAND. 06/11/11
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7628 ft. | # Of Holes: | 112 | | Interval Bottom: | 7888 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/14/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|