|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/21/2018 Measured TD: 8405 ft. Vertical TD: 8370 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/21/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/10/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 50 FSL 1310 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 50 FSL 1310 FEL | | Proposed Depth/Form: | 8401 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8401 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 7616 ft., Bottom: 8401 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/27/2011 | | Spud Date: | 4/23/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8405 ft. | Measured PB depth: | 8364 ft. | | True Vertical TD: | 8370 ft. | True Vertical PB depth: | 8329 ft. | | Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 146 FSL 1373 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 169 FSL 1382 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1081 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1081 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8393 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 3850 ft., Bottom: 8393 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4544 ft. | | | | | NIOBRARA | 7494 ft. | | | | | CODELL | 7840 ft. | | | | | J SAND & SHANNON | 8266 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/25/2018 Interval Top: 8278 ft. Interval Bottom: 8296 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/4/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC’D THE J-SAND 8278’-8296’, (36 HOLES) W/155,148 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 246,600# 20/40 SAND. 06-04-11
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8278 ft. | # Of Holes: | 36 | | Interval Bottom: | 8296 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/26/2011 Interval Top: 7610 ft. Interval Bottom: 8296 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/26/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP@ 7530’. 06/22/11. DRILLED OUT CBP@ 7530’, CFP @ 7730’ AND 7940’ TO COMMINGLE THE JSND-CDL-NBRR. 08/23/11
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8258 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 64 | | BBLS_OIL | 84 | | BTU_GAS | 1212 | | CALC_BBLS_H2O | 64 | | CALC_BBLS_OIL | 84 | | CALC_GOR | 2238 | | CALC_MCF_GAS | 188 | | CASING_PRESS | 2201 | | GRAVITY_OIL | 40 | | MCF_GAS | 188 | | TUBING_PRESS | 1032 |
| | Perforation Data: | | Interval Top: | 7610 ft. | # Of Holes: | 156 | | Interval Bottom: | 8296 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/25/2018 Interval Top: 7610 ft. Interval Bottom: 7860 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/10/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP@7940’. 06-10-11. FRAC’D THE CODELL 7840’-7860’ (40 HOLES) W/117,214 GAL 27# TO 21# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,261# 20/40 SAND. 06-10-11
SET CFP@7730’. 06-10-11. FRAC’D THE NIOBRARA 7610’-7630’ (80 HOLES) W/141,548 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 258,280# 20/40 SAND. 06/10/11
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7610 ft. | # Of Holes: | 120 | | Interval Bottom: | 7860 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/25/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|