Wellbore #00 Wellbore Classification: GW Status: AB - 7/23/2025 Measured TD: 8275 ft. Vertical TD: 8139 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/23/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/3/2012 | | Proposed Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 50 FSL 1500 FEL | | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 50 FSL 1500 FEL | | Proposed Depth/Form: | 8222 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8222 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7144 ft., Bottom: 8222 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/25/2010 | | Spud Date: | 8/20/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8275 ft. | Measured PB depth: | 8239 ft. | | True Vertical TD: | 8139 ft. | True Vertical PB depth: | 8103 ft. | | Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 100 FSL 1497 FEL | | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 108 FSL 1493 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 851 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 317, Top: 0 ft., Bottom: 851 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8268 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 4560 ft., Bottom: 8268 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4465 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 3354 ft., Bottom: 4465 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4452 ft. | | | | | NIOBRARA | 7404 ft. | | | | | CODELL | 7694 ft. | | | | | J SAND | 8122 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/23/2025 Interval Top: 8136 ft. Interval Bottom: 8154 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/22/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J SAND WITH 151,578 GAL 18 # VISAR HYBRID LINKED GEL CONTAINING 250,600 # 20/40 SAND. 9-22-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8136 ft. | # Of Holes: | 36 | | Interval Bottom: | 8154 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/14/2025 Interval Top: 7694 ft. Interval Bottom: 7712 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7694 ft. | # Of Holes: | 36 | | Interval Bottom: | 7712 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: Status: CM - 10/19/2010 Interval Top: 7468 ft. Interval Bottom: 8154 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/22/2010 | | Treatment Summary: | JSND-CD-NBRR COMMINGLE. SET CBP@7400' 10/14/10. DRILLED OUT CBP@7400', CFP@7570' AND CFP@7880' TO COMMINGLE THE JSND-CD-NNRR 10/15/10 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8095 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/19/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 26 | | BTU_GAS | 1305 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 5038 | | CALC_MCF_GAS | 131 | | CASING_PRESS | 1797 | | GRAVITY_OIL | 49 | | MCF_GAS | 131 | | TUBING_PRESS | 1110 |
| | Perforation Data: | | Interval Top: | 7468 ft. | # Of Holes: | 152 | | Interval Bottom: | 8154 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/23/2025 Interval Top: 7468 ft. Interval Bottom: 7712 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/22/2010 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 7880'. 9-22-10. FRAC'D THE CODELL WITH 108,864 GAL 22 # VISTAR HYBRID CORSS LINKED GEL CONTAINING 250,320 # 30/50 SAND. 9-22-10
SET CFP @ 7570'. 9-23-10. FRAC'D THE NIOBRARA WITH 130,578 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,880 # 30/50 SAND. 9-23-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7468 ft. | # Of Holes: | 116 | | Interval Bottom: | 7712 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 4/14/2025 Interval Top: 7468 ft. Interval Bottom: 7488 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7468 ft. | # Of Holes: | 80 | | Interval Bottom: | 7488 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/23/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 190 |
| Total Gas Produced (MCF) | 1667 |
| GOR | 8773 |
| GOR Determination | BOE |
| Average BOE per Day | 1.345 |
| Average MCFE per Day | 7.805 |
| Federal Financial Assurance | i | |
|
|