Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31516
Well Classification: OW Status: PA - 7/22/2021
Well Name/No:Binder #10-ADU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/22/2021
FacilityID:416937LocationID:319109
County:WELD #123Location:SWNW 10 4N67W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1769FNL  373 FWLLat/Long: 40.329400 / -104.885300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.329390 / -104.885250Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/22/2021             Measured TD: 7452 ft.    Vertical TD: 7325 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/22/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/29/2012
Proposed Top PZ Location:Sec:10 Twp: 4N 67W Footage: 1365 FNL  1119 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67W Footage: 1369 FNL  1317 FWL
Proposed Depth/Form:7545 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 450 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7545 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 220, Top: 6300 ft., Bottom: 7545 ft.

Wellbore Completed
Completion Date:1/8/2011
Spud Date:1/4/2011Spud Date Is:ACTUAL
Measured TD:7452 ft.Measured PB depth:7411 ft.
True Vertical TD:7325 ft.True Vertical PB depth:7284 ft.
Top PZ Location:Sec:10 Twp: 4N 67WFootage: 1365 FNL  1119 FWL
Bottom Hole Location:Sec:10 Twp: 4N 67WFootage: 1369 FNL  1317 FWL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 466 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 466 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7435 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 0 ft., Bottom: 7435 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4130 ft.
SHANNON4700 ft.
NIOBRARA6917 ft.
FORT HAYS7283 ft.
CODELL7304 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 6/13/2011                 Interval Top: 7308 ft.    Interval Bottom: 7316 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/9/2011
Treatment Summary:Frac'd Codell with 476 bbls of slickwater pad, 144 bbls of 22# pHaser pad, 1980 bbls of 22# pHaser fluid system, 217580# of 20/40 Prefrd Rock and 8000# of SB Excel 20/40 resin coated proppant.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7308 ft.# Of Holes:24
Interval Bottom:7316 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/22/2021                 Interval Top: 6978 ft.    Interval Bottom: 7316 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/26/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 16
BTU_GAS 1303
CALC_BBLS_H2O 11
CALC_BBLS_OIL 16
CALC_GOR 5938
CALC_MCF_GAS 95
CASING_PRESS 512
GRAVITY_OIL 52
MCF_GAS 95
Perforation Data:
Interval Top:6978 ft.# Of Holes:52
Interval Bottom:7316 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 6/13/2011                 Interval Top: 6978 ft.    Interval Bottom: 7095 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/9/2011
Treatment Summary:Perf'd Niobrara "A" 6978-80' (4 holes), Niobrara "B" 7087-95' (24 holes), Niobrara "C" 6481'-6489' (16 holes) Frac'd Niobrara w/ 119 bbl FE-1A Pad, 1548 bbls Slickwater pad, 144 20# bbls of pHaser pad, 2248 bbls 20# pHaser fluid system, 238580# 20/40 Prefrd Rock and 12000# of SB Excel 20/40 resin coated proppant.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6978 ft.# Of Holes:28
Interval Bottom:7095 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/22/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No