|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2023 Measured TD: 7490 ft. Vertical TD: 7310 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/29/2012 | | Proposed Top PZ Location: | Sec:10 Twp: 4N 67W | Footage: 659 FNL 661 FWL | | Bottom Hole Location: | Sec:10 Twp: 4N 67W | Footage: 659 FNL 661 FWL | | Proposed Depth/Form: | 7598 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NW4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 80, Drill Unit: W2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 0 ft., Bottom: 450 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7598 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 226, Top: 6398 ft., Bottom: 7598 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/13/2010 | | Spud Date: | 10/8/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7490 ft. | Measured PB depth: | 7445 ft. | | True Vertical TD: | 7310 ft. | True Vertical PB depth: | 7265 ft. | | Top PZ Location: | Sec:10 Twp: 4N 67W | Footage: 637 FNL 643 FWL | | Bottom Hole Location: | Sec:10 Twp: 4N 67W | Footage: 624 FNL 624 FWL | | Log Types: | CBL, CNL/CDL/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 465 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 465 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7474 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 995, Top: 0 ft., Bottom: 7490 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4180 ft. | | | | | SHANNON | 4748 ft. | | | | | NIOBRARA | 6508 ft. | | | | | FORT HAYS | 6729 ft. | | | | | CODELL | 6803 ft. | | | |
Formation CODL Formation Classification: Status: CM - 6/13/2011 Interval Top: 7327 ft. Interval Bottom: 7335 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2011 | | Treatment Summary: | Frac'd Codell with 477 bbls of slickwater pad, 144 bbls of pHaser 22# pad, 1971 bbls of pHaser 22# fluid system, 217240# of 20/40 Preferd Rock and 8000# of SB Excel 20/40. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7327 ft. | # Of Holes: | 24 | | Interval Bottom: | 7335 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: SI - 3/1/2023 Interval Top: 7035 ft. Interval Bottom: 7335 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/26/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 35 | | BTU_GAS | 1236 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 4401 | | CALC_MCF_GAS | 154 | | CASING_PRESS | 703 | | GRAVITY_OIL | 51 | | MCF_GAS | 154 |
| | Perforation Data: | | Interval Top: | 7035 ft. | # Of Holes: | 52 | | Interval Bottom: | 7335 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 6/13/2011 Interval Top: 7035 ft. Interval Bottom: 7150 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2011 | | Treatment Summary: | Perf'd Niobrara "A" 7035-37'' (4 holes), Niobrara "B" 7142-50' (24 holes),
Frac'd Niobrara with 119 bbls of FE-1A Pad, 1550 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2261 bbls of pHaser 20# fluid system, 238460# 20/40 Preferd Rock, 12000# 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7035 ft. | # Of Holes: | 28 | | Interval Bottom: | 7150 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2023 |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|