Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31504
Well Classification: GW Status: PA - 10/2/2019
Well Name/No:KISSLER K #21-20D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/2/2019
FacilityID:416877LocationID:416874
County:WELD #123Location:NESW 21 4N66W 6
Field:WATTENBERG - #90750Elevation:4756 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2610FSL  2185 FWLLat/Long: 40.297050 / -104.784050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.297060 / -104.784060Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/21/2012
End Date: 2/21/2012
Reported: 2/27/2012
Prior to rule 205A.b.(2)(A)
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/2/2019             Measured TD: 7569 ft.    Vertical TD: 7459 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/2/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/27/2012
Proposed Top PZ Location:Sec:21 Twp: 4N 66W Footage: 2576 FSL  1297 FWL
Bottom Hole Location:Sec:21 Twp: 4N 66w Footage: 2576 FSL  1297 FWL
Proposed Depth/Form:7540 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 208, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7540 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 540, Top: , Bottom: 7540 ft.

Wellbore Completed
Completion Date:1/16/2012
Spud Date:1/13/2012Spud Date Is:ACTUAL
Measured TD:7569 ft.Measured PB depth:7515 ft.
True Vertical TD:7459 ft.True Vertical PB depth:7405 ft.
Top PZ Location:Sec:21 Twp: 4N 66WFootage: 2541 FSL  1293 FWL
Bottom Hole Location:Sec:21 Twp: 4N 66WFootage: 2537 FSL  1295 FWL
Log Types:CBL Triple Combo
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 616 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 245, Top: 0 ft., Bottom: 616 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7559 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 1519 ft., Bottom: 7559 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2495 ft.
PARKMAN3787 ft.
SUSSEX4455 ft.
SHANNON4899 ft.
NIOBRARA7038 ft.
FORT HAYS7341 ft.
CODELL7364 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 8/23/2012                 Interval Top: 7365 ft.    Interval Bottom: 7381 ft.

 Completed Information for Formation CODELL
1st Production Date:2/22/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/2012
Treatment Summary:Pumped 118,796 lbs of Ottawa Proppant and 116,980 gallons of 15% HCL and Slick Water and Silverstim. Commingle the Niobrara and Codell
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7365 ft.# Of Holes:64
Interval Bottom:7381 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:                     Status:  AB - 10/2/2019                 Interval Top: 7056 ft.    Interval Bottom: 7381 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2012Test Method:FLOWING
Hours Tested:9Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 6
BTU_GAS 1219
CALC_BBLS_H2O 22
CALC_BBLS_OIL 6
CALC_GOR 32000
CALC_MCF_GAS 192
CASING_PRESS 1500
GRAVITY_OIL 62
MCF_GAS 192
Perforation Data:
Interval Top:7056 ft.# Of Holes:112
Interval Bottom:7381 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 8/23/2012                 Interval Top: 7056 ft.    Interval Bottom: 7158 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/22/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/2012
Treatment Summary:Pumped 193,306 lbs of Ottawa Proppant and 154,915 gallons of Slick Water and Silverstim Commingle the Niobrara and Codell
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7056 ft.# Of Holes:48
Interval Bottom:7158 ft.Hole Size:0.69 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/02/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No