|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/28/2022 Measured TD: 8292 ft. Vertical TD: 7825 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/28/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/20/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 1392 FSL 201 FEL | | Bottom Hole Location: | Sec:5 Twp: 3N 67 | Footage: 1372 FSL 177 FEL | | Proposed Depth/Form: | 8287 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 212, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8257 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 807, Top: , Bottom: 8257 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/3/2012 | | Spud Date: | 2/18/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8292 ft. | Measured PB depth: | 8237 ft. | | True Vertical TD: | 7825 ft. | True Vertical PB depth: | 7770 ft. | | Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 1392 FSL 201 FEL | | Bottom Hole Location: | Sec:5 Twp: 3N 67 | Footage: 1372 FSL 177 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 614 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 229, Top: 0 ft., Bottom: 614 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8277 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 2900 ft., Bottom: 8277 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 352 ft. | | | | | PARKMAN | 3805 ft. | | | | | SUSSEX | 4428 ft. | | | | | SHANNON | 4908 ft. | | | | | NIOBRARA | 7365 ft. | | | | | FORT HAYS | 7635 ft. | | | | | CODELL | 7655 ft. | | | | | MOWRY | 8083 ft. | | | | | J SAND | 8102 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/28/2022 Interval Top: 8129 ft. Interval Bottom: 8145 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2012 | | Treatment Summary: | Pumped 274,723 lbs of Ottawa Proppant, 16,727 lbs of SB Excel Proppant and 147,759 gallons of Silverstim.
The J-Sand is producing through a composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8129 ft. | # Of Holes: | 64 | | Interval Bottom: | 8145 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/5/2012 Interval Top: 7658 ft. Interval Bottom: 7678 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/22/2012 | | Treatment Summary: | Pumped 247,664 lbs of Ottawa Proppant and 118,272 gallons of 15% HCL, Slick Water, and Silverstim.
The Codell is producing through a composite flow through plug.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7658 ft. | # Of Holes: | 80 | | Interval Bottom: | 7678 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 6/11/2012 Interval Top: 7453 ft. Interval Bottom: 8145 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8112 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/11/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 62 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 62 | | CALC_GOR | 5484 | | CALC_MCF_GAS | 340 | | CASING_PRESS | 1000 | | GRAVITY_OIL | 48 | | MCF_GAS | 340 |
| | Perforation Data: | | Interval Top: | 7453 ft. | # Of Holes: | 192 | | Interval Bottom: | 8145 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/28/2022 Interval Top: 7453 ft. Interval Bottom: 7678 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7453 ft. | # Of Holes: | 128 | | Interval Bottom: | 7678 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/5/2012 Interval Top: 7453 ft. Interval Bottom: 7552 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/22/2012 | | Treatment Summary: | Pumped 259,954 lbs of Ottawa Proppant and 156,249 gallons of Slick Water and Silverstim.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7453 ft. | # Of Holes: | 48 | | Interval Bottom: | 7552 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/28/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|