|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/28/2022 Measured TD: 8315 ft. Vertical TD: 7793 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/28/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/20/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 151 FSL 1380 FEL | | Bottom Hole Location: | Sec:5 Twp: 3N 67W | Footage: 110 FSL 1357 FEL | | Proposed Depth/Form: | 8307 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 212, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7883 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 751, Top: , Bottom: 7883 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/18/2012 | | Spud Date: | 2/9/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8315 ft. | Measured PB depth: | 8269 ft. | | True Vertical TD: | 7793 ft. | True Vertical PB depth: | 7747 ft. | | Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 151 FSL 1380 FEL | | Bottom Hole Location: | Sec:5 Twp: 3N 67W | Footage: 110 FSL 1357 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 597 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 229, Top: 0 ft., Bottom: 597 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8315 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 722, Top: 950 ft., Bottom: 8315 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 352 ft. | | | | | PARKMAN | 3836 ft. | | | | | SUSSEX | 4466 ft. | | | | | SHANNON | 4933 ft. | | | | | NIOBRARA | 7417 ft. | | | | | FORT HAYS | 7689 ft. | | | | | CODELL | 7709 ft. | | | | | MOWRY | 8136 ft. | | | | | J SAND | 8154 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/18/2022 Interval Top: 8177 ft. Interval Bottom: 8193 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2012 | | Treatment Summary: | Pumped 267,203 lbs of Ottawa Proppant, 2943 lbs of SB Excel Proppant and 147,286 gallons of Silverstim.
The J-Sand is producing through a composite flow through plug.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8177 ft. | # Of Holes: | 64 | | Interval Bottom: | 8193 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/1/2012 Interval Top: 7711 ft. Interval Bottom: 7731 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2012 | | Treatment Summary: | Pumped 216,898 lbs of Ottawa Proppant and 91,922 gallons of 15% HCL, Slick Water, and Silverstim.
The Codell is producing through a composite flow through plug.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7711 ft. | # Of Holes: | 80 | | Interval Bottom: | 7731 ft. | Hole Size: | 0.44 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 6/16/2012 Interval Top: 7509 ft. Interval Bottom: 8193 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8159 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2012 | Test Method: | Flowing | | Hours Tested: | 23 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 26 | | BTU_GAS | 1252 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 3852 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 592 | | GRAVITY_OIL | 46 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7509 ft. | # Of Holes: | 192 | | Interval Bottom: | 8193 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/18/2022 Interval Top: 7509 ft. Interval Bottom: 7731 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7509 ft. | # Of Holes: | 128 | | Interval Bottom: | 7731 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/1/2012 Interval Top: 7509 ft. Interval Bottom: 7599 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/8/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2012 | | Treatment Summary: | Pumped 228,060 lbs of Ottawa Proppant and 155,151 gallons of Slick Water and Silverstim.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7509 ft. | # Of Holes: | 48 | | Interval Bottom: | 7599 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/18/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|