Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31476
Well Classification: OW Status: PA - 8/3/2021
Well Name/No:UPV P #05-18D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/3/2021
FacilityID:416748LocationID:416717
County:WELD #123Location:NWSE 5 3N67W 6
Field:WATTENBERG - #90750Elevation:4875 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2511FSL  2281 FELLat/Long: 40.254560 / -104.913050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.254570 / -104.912970Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2012
End Date: 4/3/2012
Reported: 4/16/2012
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/3/2021             Measured TD: 8095 ft.    Vertical TD: 7832 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/3/2021
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:4/20/2012
Proposed Top PZ Location:Sec:5 Twp: 3N 67W Footage: 1353 FNL  2325 FEL
Bottom Hole Location:Sec:5 Twp: 3N 67W Footage: 1357 FNL  2321 FEL
Proposed Depth/Form:8069 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 212, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7615 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 712, Top: , Bottom: 7615 ft.

Wellbore Completed
Completion Date:2/2/2012
Spud Date:1/27/2012Spud Date Is:ACTUAL
Measured TD:8095 ft.Measured PB depth:8044 ft.
True Vertical TD:7832 ft.True Vertical PB depth:7781 ft.
Top PZ Location:Sec:5 Twp: 3N 67WFootage: 1353 FNL  2325 FEL
Bottom Hole Location:Sec:5 Twp: 3N 67WFootage: 1357 FNL  2321 FEL
Log Types:CBL TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 606 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 243, Top: 0 ft., Bottom: 606 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8089 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 695, Top: 960 ft., Bottom: 8089 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2411 ft.
PARKMAN3760 ft.
SUSSEX4368 ft.
SHANNON5274 ft.
NIOBRARA7165 ft.
FORT HAYS7450 ft.
CODELL7471 ft.
J SAND7922 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 4/21/2014                 Interval Top: 7946 ft.    Interval Bottom: 7964 ft.

 Completed Information for Formation J SAND
1st Production Date:7/24/2012Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/19/2012Treatment End Date:N/A
Treatment Summary:9/19/2012 UNDER CIPB AND 2 SXS VIA DUMP BAIL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/3/2012
Treatment Summary:PUMPED 284023# PREFERRED ROCK DOWNHOLE in 169279gals of SilverStim/GELLED/RECYCLED/FRESH WATER CODELL IS PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUG FLOWBACK VOLUMES REPORTED ON CODELL PANEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7946 ft.# Of Holes:68
Interval Bottom:7964 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  AB - 8/3/2021                  Interval Top: 7473 ft.    Interval Bottom: 7493 ft.

 Completed Information for Formation CODELL
1st Production Date:7/24/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2012
Treatment Summary:FRAC'D W/129058 GALS SILVERSTIM AND SLICK WATER AND 251386# OTTAWA SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7460 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1188
CALC_BBLS_OIL 3
CASING_PRESS 709
GRAVITY_OIL 54
TUBING_PRESS 694
Perforation Data:
Interval Top:7473 ft.# Of Holes:80
Interval Bottom:7493 ft.Hole Size:0.44 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 8/12/2012                 Interval Top: 7473 ft.    Interval Bottom: 7964 ft.

 Completed Information for Formation J-CODELL
1st Production Date:7/24/2012Choke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/12/2012Treatment End Date:N/A
Treatment Summary:CODELL IS PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUG FLOWBACK VOLUMES REPORTED ON CODELL PANEL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
CALC_BBLS_OIL 3
CASING_PRESS 709
GRAVITY_OIL 40
TUBING_PRESS 694
Perforation Data:
Interval Top:7473 ft.# Of Holes:148
Interval Bottom:7964 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/03/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No