|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/28/2022 Measured TD: 7967 ft. Vertical TD: 7828 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/28/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/15/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 2481 FNL 1249 FEL | | Bottom Hole Location: | Sec:5 Twp: 3N 67W | Footage: 2477 FNL 1249 FEL | | Proposed Depth/Form: | 7930 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 212, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7486 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 693, Top: , Bottom: 7486 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/4/2012 | | Spud Date: | 3/4/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7967 ft. | Measured PB depth: | 7913 ft. | | True Vertical TD: | 7828 ft. | True Vertical PB depth: | 7774 ft. | | Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 2481 FNL 1249 FEL | | Bottom Hole Location: | Sec:5 Twp: 3N 67W | Footage: 2477 FNL 1249 FEL | | Log Types: | TRIPLE COMBO
CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 606 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 201, Top: 0 ft., Bottom: 606 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7957 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 1694 ft., Bottom: 7957 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2399 ft. | | | | | PARKMAN | 3710 ft. | | | | | SUSSEX | 4289 ft. | | | | | SHANNON | 5111 ft. | | | | | NIOBRARA | 7042 ft. | | | | | CODELL | 7345 ft. | | | | | J SAND | 7790 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/24/2022 Interval Top: 7811 ft. Interval Bottom: 7827 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/12/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/5/2012 | | Treatment Summary: | PUMPED 262887# PREFERRED ROCK & 13729# SB ExCEL IN 163453 GALS OF SLICK/SILVERSTIM/GELLED/RECYCLED/FRESH WATER.
J-SAND IS PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUG
NIOBRARA WAS NOT COMPLETED (PERFORATED) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7811 ft. | # Of Holes: | 64 | | Interval Bottom: | 7827 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: AB - 10/24/2022 Interval Top: 7346 ft. Interval Bottom: 7366 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/12/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/5/2012 | | Treatment Summary: | PUMPED 249511# PREFERRED ROCK IN 127171GALS OF SLICK/SILVERSTIM/GELLED/RECYCLED/FRESH WATER.
J-SAND IS PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUG
NIOBRARA WAS NOT COMPLETED (PERFORATED) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7346 ft. | # Of Holes: | 80 | | Interval Bottom: | 7366 ft. | Hole Size: | 0.4 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 6/16/2012 Interval Top: 7346 ft. Interval Bottom: 7827 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 6/12/2012 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/16/2012 | Treatment End Date: | N/A | | Treatment Summary: | J-SAND IS PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUG
NIOBRARA WAS NOT COMPLETED (PERFORATED) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 93 | | BTU_GAS | 1228 | | CALC_BBLS_H2O | 29 | | CALC_BBLS_OIL | 93 | | CALC_GOR | 1742 | | CALC_MCF_GAS | 162 | | CASING_PRESS | 1000 | | GRAVITY_OIL | 50 | | MCF_GAS | 162 |
| | Perforation Data: | | Interval Top: | 7346 ft. | # Of Holes: | 144 | | Interval Bottom: | 7827 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|