Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2025 Measured TD: 8500 ft. Vertical TD: 8091 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/22/2014 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 50 FNL 2550 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 50 FNL 2550 FWL | | Proposed Depth/Form: | 8388 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8388 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7340 ft., Bottom: 8388 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/4/2013 | | Spud Date: | 12/30/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8500 ft. | Measured PB depth: | 8466 ft. | | True Vertical TD: | 8091 ft. | True Vertical PB depth: | 8057 ft. | | Top PZ Location: | Sec:35 Twp: 3N 66W | Footage: 8 FSL 2561 FWL | | Bottom Hole Location: | Sec:8 Twp: 3N 66W | Footage: 24 FSL 2610 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 837 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 848 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8486 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 655, Top: 4170 ft., Bottom: 8500 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4862 ft. | | | | | NIOBRARA | 7646 ft. | | | | | CODELL | 7941 ft. | | | | | J SAND | 8339 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 8362 ft. Interval Bottom: 8408 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/17/2013 | Treatment End Date: | 5/13/2013 | | Treatment Summary: | Frac'd the J Sand with 100,660# 40/70 and 96,436 gals SLF. 05-17-13 | | Total fluid used in treatment (bbls): | 2296 | Max pressure during treatment (psi): | 4770 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.67 | | Recycled water used in treatment (bbls): | 2296 | Total flowback volume recovered (bbls): | 236 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 100660 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8362 ft. | # Of Holes: | 78 | | Interval Bottom: | 8408 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/27/2013 Interval Top: 7942 ft. Interval Bottom: 7958 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/18/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/18/2013 | Treatment End Date: | 5/18/2013 | | Treatment Summary: | Set CFP @ 8032'. 05-17-13
Frac'd the Codell with 100,360# 40/70 and 95,912 gals SLF. 05-18-13 | | Total fluid used in treatment (bbls): | 2284 | Max pressure during treatment (psi): | 4997 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 2284 | Total flowback volume recovered (bbls): | 236 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 100360 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7942 ft. | # Of Holes: | 48 | | Interval Bottom: | 7958 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/28/2013 Interval Top: 7695 ft. Interval Bottom: 8408 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/28/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7650'. 06-29-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 07-03-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8325 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/28/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 50 | | BTU_GAS | 1320 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 4640 | | CALC_MCF_GAS | 232 | | CASING_PRESS | 996 | | GRAVITY_OIL | 51 | | MCF_GAS | 232 | | TUBING_PRESS | 298 |
| | Perforation Data: | | Interval Top: | 7695 ft. | # Of Holes: | 238 | | Interval Bottom: | 8408 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 7695 ft. Interval Bottom: 7958 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7695 ft. | # Of Holes: | 160 | | Interval Bottom: | 7958 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/27/2013 Interval Top: 7695 ft. Interval Bottom: 7812 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/18/2013 | Treatment End Date: | 5/18/2013 | | Treatment Summary: | Set CFP @ 7864' . 05-18-13
Frac the Nio B&C with 102,840# 40/70 and 97,213 gals SLF. 05-18-13
| | Total fluid used in treatment (bbls): | 2315 | Max pressure during treatment (psi): | 5373 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 2315 | Total flowback volume recovered (bbls): | 236 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 102840 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7695 ft. | # Of Holes: | 112 | | Interval Bottom: | 7812 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 6 |
| Total Gas Produced (MCF) | 84 |
| GOR | 14000 |
| GOR Determination | BOE |
| Average BOE per Day | 0.057 |
| Average MCFE per Day | 0.322 |
| Federal Financial Assurance | i | |
|
|