|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2025 Measured TD: 8375 ft. Vertical TD: 8082 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/22/2014 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 2581 FNL 50 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 2581 FNL 50 FWL | | Proposed Depth/Form: | 8358 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8358 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7308 ft., Bottom: 8358 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/26/2012 | | Spud Date: | 12/22/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8375 ft. | Measured PB depth: | 8350 ft. | | True Vertical TD: | 8082 ft. | True Vertical PB depth: | 8057 ft. | | Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 2599 FNL 11 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 2587 FNL 19 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 836 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 838 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8363 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 3450 ft., Bottom: 8375 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4797 ft. | | | | | NIOBRARA | 7539 ft. | | | | | CODELL | 7814 ft. | | | | | J SAND | 8272 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 8274 ft. Interval Bottom: 8330 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2013 | Treatment End Date: | 5/16/2013 | | Treatment Summary: | Frac'd the J Sand with 100,960# 40/70 and 96,554 gals SLF. 05-16-13 | | Total fluid used in treatment (bbls): | 2298 | Max pressure during treatment (psi): | 4546 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 2298 | Total flowback volume recovered (bbls): | 329 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 100960 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8274 ft. | # Of Holes: | 69 | | Interval Bottom: | 8330 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/4/2013 Interval Top: 7815 ft. Interval Bottom: 7831 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2013 | Treatment End Date: | 5/16/2013 | | Treatment Summary: | Set CFP @ 7890'. 05-16-13
Frac'd the Codell with 97,940# 40/70 and 96,321 gals SLF. 05-16-13 | | Total fluid used in treatment (bbls): | 2293 | Max pressure during treatment (psi): | 5141 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 2293 | Total flowback volume recovered (bbls): | 329 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 97940 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7815 ft. | # Of Holes: | 48 | | Interval Bottom: | 7831 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/25/2013 Interval Top: 7578 ft. Interval Bottom: 8330 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/25/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7530'. 06-29-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 07-01-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8233 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/25/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 201 | | BBLS_OIL | 50 | | BTU_GAS | 1320 | | CALC_BBLS_H2O | 201 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 1580 | | CALC_MCF_GAS | 79 | | CASING_PRESS | 1303 | | GRAVITY_OIL | 51 | | MCF_GAS | 79 | | TUBING_PRESS | 472 |
| | Perforation Data: | | Interval Top: | 7578 ft. | # Of Holes: | 181 | | Interval Bottom: | 8330 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 7578 ft. Interval Bottom: 7831 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7578 ft. | # Of Holes: | 160 | | Interval Bottom: | 7831 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/4/2013 Interval Top: 7578 ft. Interval Bottom: 7689 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/18/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/17/2013 | Treatment End Date: | 5/17/2013 | | Treatment Summary: | Set CFP @ 7724'. 05-16-13
Frac'd the Niobrara B&C with 101,740# 40/70 and 100,758 gals SLF. 05-17-13 | | Total fluid used in treatment (bbls): | 2399 | Max pressure during treatment (psi): | 5461 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.92 | | Recycled water used in treatment (bbls): | 2399 | Total flowback volume recovered (bbls): | 329 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 101740 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7578 ft. | # Of Holes: | 112 | | Interval Bottom: | 7689 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 204 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.098 |
| Average MCFE per Day | 0.557 |
| Federal Financial Assurance | i | |
|
|