|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/7/2025 Measured TD: 8190 ft. Vertical TD: 8126 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/7/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/30/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 510 FNL 510 FEL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 510 FNL 510 FEL | | Proposed Depth/Form: | 8141 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E2 OF SEC2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 OF SEC2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 of SEC2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 840 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 840 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8141 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7098 ft., Bottom: 8141 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/6/2010 | | Spud Date: | 7/31/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8190 ft. | Measured PB depth: | 8128 ft. | | True Vertical TD: | 8126 ft. | True Vertical PB depth: | 8064 ft. | | Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 526 FNL 560 FEL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 503 FNL 592 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 879 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 879 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8166 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 3290 ft., Bottom: 8166 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4718 ft. | | | | | NIOBRARA | 7326 ft. | | | | | CODELL | 7568 ft. | | | | | J SAND | 8022 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/7/2025 Interval Top: 8022 ft. Interval Bottom: 8080 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/27/2010 | | Treatment Summary: | J Sand Perfs: 8022 - 8038, 8070 - 8080
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8022 ft. | # Of Holes: | 52 | | Interval Bottom: | 8080 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/3/2025 Interval Top: 7568 ft. Interval Bottom: 7584 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7568 ft. | # Of Holes: | 32 | | Interval Bottom: | 7584 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/18/2010 Interval Top: 7378 ft. Interval Bottom: 8080 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/27/2010 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7989 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/18/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 47 | | CALC_BBLS_H2O | 60 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 5936 | | CALC_MCF_GAS | 279 | | CASING_PRESS | 1099 | | GRAVITY_OIL | 50 | | MCF_GAS | 279 | | TUBING_PRESS | 432 |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 148 | | Interval Bottom: | 8080 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/7/2025 Interval Top: 7378 ft. Interval Bottom: 7584 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/27/2010 | | Treatment Summary: | CD-NB COMPLETION. SET CFP@7700'. FRAC'D CD WITH 111,384 GAL 22# VISTAR HYBRID X-LINKED GEL CONTAINING 250,900# 30/50 SAND. 8/27/10. SET CFP @ 7500'. FRAC'D NB WITH 144,228 GAL 18# VISTAR HYBRID X-LINKED GEL CONTAINING 251,800# 30/50 SAND 8/30/10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 96 | | Interval Bottom: | 7584 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/3/2025 Interval Top: 7378 ft. Interval Bottom: 7398 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 64 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/07/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|