|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/17/2021 Measured TD: 7693 ft. Vertical TD: 7590 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/17/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/30/2012 | | Proposed Top PZ Location: | Sec:19 Twp: 3N 65W | Footage: 1333 FSL 54 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 65W | Footage: 1334 FSL 52 FWL | | Proposed Depth/Form: | 7699 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7699 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 724, Top: , Bottom: 7699 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 3/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7693 ft. | Measured PB depth: | 7626 ft. | | True Vertical TD: | 7590 ft. | True Vertical PB depth: | 7523 ft. | | Top PZ Location: | Sec:19 Twp: 3N 65W | Footage: 1333 FSL 54 FWL | | Bottom Hole Location: | Sec:19 Twp: 3N 65W | Footage: 1334 FSL 52 FWL | | Log Types: | GRL/CCL/CBL/VDL, SDL/DSNL/ACL/TRL. | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 769 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 67 ft., Bottom: 769 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7670 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 2151 ft., Bottom: 7670 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7670 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 327 ft., Bottom: 1422 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 327 ft., Depth: 1402 ft., Bottom: 1422 ft., Sacks: 260, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7186 ft. | | | | | FORT HAYS | 7472 ft. | | | | | CODELL | 7487 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 6/17/2021 Interval Top: 7266 ft. Interval Bottom: 7501 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/23/2011 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/20/2011 | | Treatment Summary: | Frac'd Niobrara-Codell w/ 272496 gals of Silverstim and Slick Water with 495,500#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/27/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 65 | | BBLS_OIL | 82 | | BTU_GAS | 1241 | | CALC_BBLS_H2O | 65 | | CALC_BBLS_OIL | 82 | | CALC_GOR | 7756 | | CALC_MCF_GAS | 636 | | CASING_PRESS | 650 | | GRAVITY_OIL | 55 | | MCF_GAS | 636 |
| | Perforation Data: | | Interval Top: | 7266 ft. | # Of Holes: | 100 | | Interval Bottom: | 7501 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/17/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|