Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31398
Well Classification: OW Status: TA - 11/25/2020
Well Name/No:IONE #4-6-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/25/2020
FacilityID:416495LocationID:318839
County:WELD #123Location:NESE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1520FSL  973 FELLat/Long: 40.149430 / -104.795310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.149538 / -104.795193Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/13/2013
End Date: 2/13/2013
Reported: 6/19/2013
Days to report: 126
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/25/2020             Measured TD: 8244 ft.    Vertical TD: 7962 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/25/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/5/2014
Proposed Top PZ Location:Sec:8 Twp: 2N 66W Footage: 1322 FSL  2647 FEL
Bottom Hole Location:Sec:8 Twp: 2N 66W Footage: 1325 FSL  2654 FEL
Proposed Depth/Form:8205 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8205 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 7165 ft., Bottom: 8205 ft.

Wellbore Completed
Completion Date:12/1/2012
Spud Date:11/27/2012Spud Date Is:ACTUAL
Measured TD:8244 ft.Measured PB depth:8208 ft.
True Vertical TD:7962 ft.True Vertical PB depth:7926 ft.
Top PZ Location:Sec:8 Twp: 2N 66WFootage: 1322 FSL  2647 FEL
Bottom Hole Location:Sec:8 Twp: 2N 66WFootage: 1325 FSL  2654 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 840 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8244 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 4280 ft., Bottom: 8244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4746 ft.
NIOBRARA7398 ft.
CODELL7666 ft.
J SAND8108 ft.

Formation JSND                     Formation Classification:  OW                     Status:  TA - 11/25/2020                Interval Top: 8120 ft.    Interval Bottom: 8148 ft.

 Completed Information for Formation J SAND
1st Production Date:3/28/2013Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/11/2013Treatment End Date:3/11/2013
Treatment Summary:Frac'd the J Sand with 250,000# 20/40 with 3982 bbls total fluid. 03-11-13
Total fluid used in treatment (bbls):3982Max pressure during treatment (psi):4307
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.56
Recycled water used in treatment (bbls):3982Total flowback volume recovered (bbls):328
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8120 ft.# Of Holes:50
Interval Bottom:8148 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/28/2013                 Interval Top: 7668 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation CODELL
1st Production Date:3/28/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/11/2013Treatment End Date:3/11/2013
Treatment Summary:Set CFP @ 7730'. 03-11-13 Frac'd the Codell with 251500# 30/50 with 2749 bbls total fluid. 03-11-13
Total fluid used in treatment (bbls):2749Max pressure during treatment (psi):4553
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):2749Total flowback volume recovered (bbls):328
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7668 ft.# Of Holes:60
Interval Bottom:7684 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 4/1/2013                  Interval Top: 7446 ft.    Interval Bottom: 8148 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:3/28/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:4/1/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7370'. 03-11-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 03-12-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8086 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 17
BTU_GAS 1254
CALC_BBLS_H2O 20
CALC_BBLS_OIL 17
CALC_GOR 7118
CALC_MCF_GAS 121
CASING_PRESS 1098
GRAVITY_OIL 47
MCF_GAS 121
TUBING_PRESS 473
Perforation Data:
Interval Top:7446 ft.# Of Holes:166
Interval Bottom:8148 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 11/25/2020                Interval Top: 7446 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/28/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7446 ft.# Of Holes:116
Interval Bottom:7684 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/28/2013                 Interval Top: 7446 ft.    Interval Bottom: 7545 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/28/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/11/2013Treatment End Date:3/11/2013
Treatment Summary:Set CFP @ 7490'. 03-11-13 Frac'd the Niobrara with 250060# 30/50 with 3354 bbls total fluid. 03-11-13
Total fluid used in treatment (bbls):3354Max pressure during treatment (psi):6303
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):3354Total flowback volume recovered (bbls):328
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250060Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7446 ft.# Of Holes:56
Interval Bottom:7545 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No