Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31398
Well Classification: OW Status: TA - 11/25/2020
Well Name/No:IONE #4-6-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/25/2020
FacilityID:416495LocationID:318839
County:WELD #123Location:NESE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1520FSL  973 FELLat/Long: 40.149430 / -104.795310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.149538 / -104.795193Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/13/2013
End Date: 2/13/2013
Reported: 6/19/2013
Days to report: 126
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/25/2020             Measured TD: 8244 ft.    Vertical TD: 7962 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/25/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/5/2014
Proposed Top PZ Location:Sec:8 Twp: 2N 66W Footage: 1322 FSL  2647 FEL
Bottom Hole Location:Sec:8 Twp: 2N 66W Footage: 1325 FSL  2654 FEL
Proposed Depth/Form:8205 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8205 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 7165 ft., Bottom: 8205 ft.

Wellbore Completed
Completion Date:12/1/2012
Spud Date:11/27/2012Spud Date Is:ACTUAL
Measured TD:8244 ft.Measured PB depth:8208 ft.
True Vertical TD:7962 ft.True Vertical PB depth:7926 ft.
Top PZ Location:Sec:8 Twp: 2N 66WFootage: 1322 FSL  2647 FEL
Bottom Hole Location:Sec:8 Twp: 2N 66WFootage: 1325 FSL  2654 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 852 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8233 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 4280 ft., Bottom: 8244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4746 ft.
NIOBRARA7398 ft.
CODELL7666 ft.
J SAND8108 ft.

Formation JSND                     Formation Classification:  OW                     Status:  TA - 11/25/2020                Interval Top: 8120 ft.    Interval Bottom: 8148 ft.

 Completed Information for Formation J SAND
1st Production Date:3/28/2013Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/11/2013Treatment End Date:3/11/2013
Treatment Summary:Frac'd the J Sand with 250,000# 20/40 with 3982 bbls total fluid. 03-11-13
Total fluid used in treatment (bbls):3982Max pressure during treatment (psi):4307
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.56
Recycled water used in treatment (bbls):3982Total flowback volume recovered (bbls):328
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8120 ft.# Of Holes:50
Interval Bottom:8148 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/28/2013                 Interval Top: 7668 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation CODELL
1st Production Date:3/28/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/11/2013Treatment End Date:3/11/2013
Treatment Summary:Set CFP @ 7730'. 03-11-13 Frac'd the Codell with 251500# 30/50 with 2749 bbls total fluid. 03-11-13
Total fluid used in treatment (bbls):2749Max pressure during treatment (psi):4553
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):2749Total flowback volume recovered (bbls):328
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7668 ft.# Of Holes:60
Interval Bottom:7684 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 4/1/2013                  Interval Top: 7446 ft.    Interval Bottom: 8148 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:3/28/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:4/1/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7370'. 03-11-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 03-12-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8086 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 17
BTU_GAS 1254
CALC_BBLS_H2O 20
CALC_BBLS_OIL 17
CALC_GOR 7118
CALC_MCF_GAS 121
CASING_PRESS 1098
GRAVITY_OIL 47
MCF_GAS 121
TUBING_PRESS 473
Perforation Data:
Interval Top:7446 ft.# Of Holes:166
Interval Bottom:8148 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 11/25/2020                Interval Top: 7446 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/28/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7446 ft.# Of Holes:116
Interval Bottom:7684 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/28/2013                 Interval Top: 7446 ft.    Interval Bottom: 7545 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/28/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/11/2013Treatment End Date:3/11/2013
Treatment Summary:Set CFP @ 7490'. 03-11-13 Frac'd the Niobrara with 250060# 30/50 with 3354 bbls total fluid. 03-11-13
Total fluid used in treatment (bbls):3354Max pressure during treatment (psi):6303
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):3354Total flowback volume recovered (bbls):328
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250060Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7446 ft.# Of Holes:56
Interval Bottom:7545 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No