|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/16/2025 Measured TD: 8396 ft. Vertical TD: 8077 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/16/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/5/2013 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 2582 FSL 97 FEL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 2583 FSL 98 FEL | | Proposed Depth/Form: | 8372 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 870 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 291, Top: 0 ft., Bottom: 870 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8372 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 171, Top: 7306 ft., Bottom: 8372 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/17/2011 | | Spud Date: | 10/11/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8396 ft. | Measured PB depth: | 8358 ft. | | True Vertical TD: | 8077 ft. | True Vertical PB depth: | 8039 ft. | | Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 2582 FSL 97 FEL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 2583 FSL 98 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 922 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 922 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8382 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 3965 ft., Bottom: 8382 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4772 ft. | | | | | NIOBRARA | 7519 ft. | | | | | CODELL | 7796 ft. | | | | | J SAND | 8256 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/16/2025 Interval Top: 8256 ft. Interval Bottom: 8319 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/26/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2011 | | Treatment Summary: | Frac'd the J-Sand 8256’– 8319’, (52 holes) w/ 66,150 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,000# 20/40 Sand. 11-04-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8256 ft. | # Of Holes: | 52 | | Interval Bottom: | 8319 ft. | Hole Size: | 0.4166667 in. |
|
Formation CODL Formation Classification: Status: CM - 3/30/2012 Interval Top: 7796 ft. Interval Bottom: 7812 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/26/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2011 | | Treatment Summary: | Set CFP @ 7850'. 11-04-11.
Frac'd the Codell 7796’ – 7812’, (32 holes) w/ 89,292 gal 22 # pHaserFrac Hybrid cross
linked gel containing 251,940 # 20/40 sand. 11-04-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7796 ft. | # Of Holes: | 32 | | Interval Bottom: | 7812 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 2/3/2012 Interval Top: 7557 ft. Interval Bottom: 8319 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/26/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2011 | | Treatment Summary: | Set CBP @ 7019'. 01-20-12. Drilled out CBP @ 7019', CFP @ 7630'. 01-23-12. Drilled out CFP @ 7850' to
commingle the JSND-NBRR-CDL. 01-24-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8245 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/3/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 49 | | BBLS_OIL | 82 | | BTU_GAS | 1250 | | CALC_BBLS_H2O | 49 | | CALC_BBLS_OIL | 82 | | CALC_GOR | 3098 | | CALC_MCF_GAS | 254 | | CASING_PRESS | 1422 | | GRAVITY_OIL | 50 | | MCF_GAS | 254 | | TUBING_PRESS | 870 |
| | Perforation Data: | | Interval Top: | 7557 ft. | # Of Holes: | 180 | | Interval Bottom: | 8319 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/16/2025 Interval Top: 7557 ft. Interval Bottom: 7812 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/26/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7557 ft. | # Of Holes: | 128 | | Interval Bottom: | 7812 ft. | Hole Size: | 0.4166667 in. |
|
Formation NBRR Formation Classification: Status: CM - 3/30/2012 Interval Top: 7557 ft. Interval Bottom: 7581 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/26/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2011 | | Treatment Summary: | Set CFP @ 7630'. 11-04-11.
Frac'd the Niobrara 7557’ – 7581’ (96 holes), w/ 102,156 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,080# 30/50 sand. 11-04-11
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7557 ft. | # Of Holes: | 96 | | Interval Bottom: | 7581 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/16/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|