|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/10/2018 Measured TD: 8249 ft. Vertical TD: 8070 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/10/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/5/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 1195 FSL 2569 FEL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 1192 FSL 2566 FEL | | Proposed Depth/Form: | 8223 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: E2SW W2SE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: E2SW W2SE | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: E2SW W2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 840 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 840 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8223 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7144 ft., Bottom: 8223 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/29/2011 | | Spud Date: | 10/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8249 ft. | Measured PB depth: | 8208 ft. | | True Vertical TD: | 8070 ft. | True Vertical PB depth: | 8029 ft. | | Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 1195 FSL 2569 FEL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 1192 FSL 2566 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 919 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 919 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8235 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 4100 ft., Bottom: 8235 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 919 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 919 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4741 ft. | | | | | NIOBRARA | 7386 ft. | | | | | CODELL | 7660 ft. | | | | | J SAND | 8115 ft. | | | |
Formation JSND Formation Classification: Status: AB - 4/16/2018 Interval Top: 8115 ft. Interval Bottom: 8170 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/16/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2011 | | Treatment Summary: | Frac'd the J-Sand 8115’– 8170’, (42 holes) w/ 64,176 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,620# 20/40 Sand. 11-06-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8115 ft. | # Of Holes: | 42 | | Interval Bottom: | 8170 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 3/8/2012 Interval Top: 7660 ft. Interval Bottom: 7681 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/16/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/2011 | | Treatment Summary: | Set CFP @ 7740'. 11-06-11
Frac'd the Codell 7660’ – 7681’, (42 holes) w/ 90,552 gal 22 # pHaserFrac Hybrid cross
linked gel containing 250,620 # 20/40 sand. 11-06-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7660 ft. | # Of Holes: | 42 | | Interval Bottom: | 7681 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 2/4/2012 Interval Top: 7425 ft. Interval Bottom: 8170 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/16/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/2011 | | Treatment Summary: | Set CBP @ 7360'. 01-29-12. Drilled out CBP @ 7360', CFP @ 7490'. 01-30-12.
Drilled out CFP @ 7740' to commingle the JSND-NBRR-CDL. 01-31-12
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8079 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 35 | | BBLS_OIL | 58 | | BTU_GAS | 1250 | | CALC_BBLS_H2O | 35 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 2034 | | CALC_MCF_GAS | 118 | | CASING_PRESS | 1363 | | GRAVITY_OIL | 50 | | MCF_GAS | 118 | | TUBING_PRESS | 412 |
| | Perforation Data: | | Interval Top: | 7425 ft. | # Of Holes: | 172 | | Interval Bottom: | 8170 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 4/16/2018 Interval Top: 7425 ft. Interval Bottom: 7681 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/16/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7425 ft. | # Of Holes: | 130 | | Interval Bottom: | 7681 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 3/8/2012 Interval Top: 7425 ft. Interval Bottom: 7447 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/16/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/2011 | | Treatment Summary: | Set CFP @ 7490'. 11-06-11
Frac'd the Niobrara 7425’ – 7447’ (88 holes), w/ 98,868 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,220# 30/50 sand. 11-06-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7425 ft. | # Of Holes: | 88 | | Interval Bottom: | 7447 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/16/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|