|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2025 Measured TD: 8265 ft. Vertical TD: 8084 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/22/2014 | | Proposed Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 1300 FNL 50 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 1300 FNL 50 FWL | | Proposed Depth/Form: | 8243 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: W2NW SEC2 E2NE SEC3 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: W2NW SEC2 E2NE SEC3 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: W2NW SEC2 E2NE SEC3 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8243 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7198 ft., Bottom: 8243 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/21/2012 | | Spud Date: | 12/17/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8265 ft. | Measured PB depth: | 8246 ft. | | True Vertical TD: | 8084 ft. | True Vertical PB depth: | 8065 ft. | | Top PZ Location: | Sec:2 Twp: 2N 66W | Footage: 1299 FNL 31 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 66W | Footage: 1284 FNL 38 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 850 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8252 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 445, Top: 3620 ft., Bottom: 8265 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4698 ft. | | | | | NIOBRARA | 7451 ft. | | | | | CODELL | 7734 ft. | | | | | J SAND | 8145 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 8153 ft. Interval Bottom: 8202 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2013 | Treatment End Date: | 5/14/2013 | | Treatment Summary: | Frac'd the J Sand with 98,640# 40/70 and 95,531 gals SLF. 05-16-13 | | Total fluid used in treatment (bbls): | 2275 | Max pressure during treatment (psi): | 4062 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 2275 | Total flowback volume recovered (bbls): | 441 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 98640 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8153 ft. | # Of Holes: | 75 | | Interval Bottom: | 8202 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/27/2013 Interval Top: 7735 ft. Interval Bottom: 7753 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2013 | Treatment End Date: | 5/16/2013 | | Treatment Summary: | Set CFP @ 7816'. 05-16-13
Frac'd the Codell with 102,740# 40/70 and 98,033 gals SLF. 05-16-13
| | Total fluid used in treatment (bbls): | 2334 | Max pressure during treatment (psi): | 5008 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 2334 | Total flowback volume recovered (bbls): | 441 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 102740 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7735 ft. | # Of Holes: | 54 | | Interval Bottom: | 7753 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/27/2013 Interval Top: 7496 ft. Interval Bottom: 8202 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/27/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7460'. 06-29-13
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 06-29-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8108 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/27/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 37 | | BTU_GAS | 1320 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 37 | | CALC_GOR | 8270 | | CALC_MCF_GAS | 306 | | CASING_PRESS | 978 | | GRAVITY_OIL | 51 | | MCF_GAS | 306 | | TUBING_PRESS | 333 |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 241 | | Interval Bottom: | 8202 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2024 Interval Top: 7496 ft. Interval Bottom: 7753 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 166 | | Interval Bottom: | 7753 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/27/2013 Interval Top: 7496 ft. Interval Bottom: 7610 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2013 | Treatment End Date: | 5/16/2013 | | Treatment Summary: | Set CFP @ 7650'. 05-16-13
Frac'd the Nio B&C with 100,140# 40/70 and 99,033 gals SLF. 05-16-13 | | Total fluid used in treatment (bbls): | 2358 | Max pressure during treatment (psi): | 5452 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 2358 | Total flowback volume recovered (bbls): | 441 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 100140 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 112 | | Interval Bottom: | 7610 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 6 |
| Total Gas Produced (MCF) | 477 |
| GOR | 79500 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.240 |
| Average MCFE per Day | 1.395 |
| Federal Financial Assurance | i | |
|
|