Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31378
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:IONE #2-4-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:416442LocationID:416456
County:WELD #123Location:SENW 2 2N66W 6
Field:WATTENBERG - #90750Elevation:5050 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1472FNL  1332 FWLLat/Long: 40.170460 / -104.749010Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.170465 / -104.749049Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/17/2013
End Date: 5/22/2013
Reported: 7/12/2013
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2025             Measured TD: 8320 ft.    Vertical TD: 8090 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/22/2014
Proposed Top PZ Location:Sec:2 Twp: 2N 66W Footage: 2580 FNL  1350 FWL
Bottom Hole Location:Sec:2 Twp: 2N 66W Footage: 2580 FNL  1350 FWL
Proposed Depth/Form:8195 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 OF SEC2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 OF SEC2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 OF SEC2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8195 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 7153 ft., Bottom: 8195 ft.

Wellbore Completed
Completion Date:12/30/2012
Spud Date:12/26/2012Spud Date Is:ACTUAL
Measured TD:8320 ft.Measured PB depth:8168 ft.
True Vertical TD:8090 ft.True Vertical PB depth:8028 ft.
Top PZ Location:Sec:2 Twp: 2N 66WFootage: 2576 FNL  1275 FWL
Bottom Hole Location:Sec:2 Twp: 2N 66WFootage: 2536 FNL  1240 FWL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 848 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8217 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 3460 ft., Bottom: 8230 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4664 ft.
NIOBRARA7371 ft.
CODELL7656 ft.
J SAND8070 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 12/1/2024                 Interval Top: 8072 ft.    Interval Bottom: 8132 ft.

 Completed Information for Formation J SAND
1st Production Date:7/19/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/17/2013Treatment End Date:5/17/2013
Treatment Summary:Frac’d the J Sand with 101,140# 40/70 and 94,416 gals SLF. 05-17-13
Total fluid used in treatment (bbls):2248Max pressure during treatment (psi):4827
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):2248Total flowback volume recovered (bbls):370
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):101140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8072 ft.# Of Holes:69
Interval Bottom:8132 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/16/2015                Interval Top: 7657 ft.    Interval Bottom: 7674 ft.

 Completed Information for Formation CODELL
1st Production Date:7/19/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/17/2013Treatment End Date:5/17/2013
Treatment Summary:Set CFP @ 7750'. 05-17-13 Frac'd the Codell with 100,440# 40/70 and 96,890 gals SLF. 05-17-13
Total fluid used in treatment (bbls):2306Max pressure during treatment (psi):5425
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):2306Total flowback volume recovered (bbls):370
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):100440Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7657 ft.# Of Holes:51
Interval Bottom:7674 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/25/2013                 Interval Top: 7418 ft.    Interval Bottom: 8132 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/19/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/25/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7380'. 06-29-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 07-02-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8033 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 86
BTU_GAS 1320
CALC_BBLS_H2O 30
CALC_BBLS_OIL 86
CALC_GOR 1965
CALC_MCF_GAS 169
CASING_PRESS 1398
GRAVITY_OIL 51
MCF_GAS 169
TUBING_PRESS 525
Perforation Data:
Interval Top:7418 ft.# Of Holes:236
Interval Bottom:8132 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 12/1/2024                 Interval Top: 7418 ft.    Interval Bottom: 7674 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/19/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7418 ft.# Of Holes:167
Interval Bottom:7674 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/16/2015                Interval Top: 7418 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/19/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/18/2013Treatment End Date:5/18/2013
Treatment Summary:Set CFP @ 7586'. 05-18-13 Frac'd the Niobrara B&C with 98,180# 40/70 and 99,880 gals SLF. 05-18-13
Total fluid used in treatment (bbls):2378Max pressure during treatment (psi):5425
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):2378Total flowback volume recovered (bbls):370
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):98180Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7418 ft.# Of Holes:116
Interval Bottom:7533 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)170
Total Gas Produced (MCF)2650
GOR15588
GOR DeterminationMCFE
Average BOE per Day1.712
Average MCFE per Day9.926

 Federal Financial Assurance  i 

 Tribal Well  i No