|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/1/2019 Measured TD: 8693 ft. Vertical TD: 8530 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/5/2012 | | Proposed Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 1984 FSL 1966 FWL | | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 1988 FSL 1965 FWL | | Proposed Depth/Form: | 8746 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SW4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 250 , Unit Acreage: 80, Drill Unit: E/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8746 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8746 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/16/2010 | | Spud Date: | 8/12/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8693 ft. | Measured PB depth: | 8645 ft. | | True Vertical TD: | 8530 ft. | True Vertical PB depth: | 8482 ft. | | Top PZ Location: | Sec:8 Twp: 1N 67W | Footage: 1984 FSL 1966 FWL | | Bottom Hole Location: | Sec:8 Twp: 1N 67W | Footage: 1988 FSL 1965 FWL | | Log Types: | Preliminary Form 5 | | Log Types: | P/E AILC-CNDL-ML-CV, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 949 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 949 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8683 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 282, Top: 6850 ft., Bottom: 8683 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5760 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 705, Top: 740 ft., Bottom: 5785 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 740 ft., Depth: 5760 ft., Bottom: 5785 ft., Sacks: 705, Method: DV TOOL | | Additional Cement: | String Type: S.C. 1.2 , Top: 849 ft., Depth: 5758 ft., Bottom: 5758 ft., Sacks: 705, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4363 ft. | | | | | SUSSEX | 4753 ft. | | | | | NIOBRARA | 7528 ft. | | | | | FORT HAYS | 7850 ft. | | | | | CODELL | 7870 ft. | | | | | J SAND | 8305 ft. | | | | | DAKOTA | 8484 ft. | | | | | MORRISON | 8611 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/2/2019 Interval Top: 8318 ft. Interval Bottom: 8344 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/17/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/4/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 146,538 gal Slickwater w/ 115,880# 40/70, 4,020# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/24/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1289 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 2080 | | CALC_MCF_GAS | 52 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 45 | | MCF_GAS | 52 |
| | Perforation Data: | | Interval Top: | 8318 ft. | # Of Holes: | 66 | | Interval Bottom: | 8344 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/2/2019 Interval Top: 7644 ft. Interval Bottom: 7889 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/17/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/7/2011 | | Treatment Summary: | NB Perf 7644-7748 Holes 60 Size 0.42 CD Perf 7873-7889 Holes 64 Size 0.40
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 255,444 gal Slickwater w/ 200,600# 40/70, 4,340# SB Excel.
Frac Codell down 4-1/2" Csg w/ 200,802 gal Slickwater w/ 150,220# 40/70, 4,100# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/24/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1289 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 2080 | | CALC_MCF_GAS | 52 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 45 | | MCF_GAS | 52 |
| | Perforation Data: | | Interval Top: | 7644 ft. | # Of Holes: | 124 | | Interval Bottom: | 7889 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/02/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|