|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/11/2019 Measured TD: 8530 ft. Vertical TD: 8382 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/11/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/24/2012 | Proposed Top PZ Location: | Sec:3 Twp: 1N 68W | Footage: 1313 FSL 57 FWL | Bottom Hole Location: | Sec:3 Twp: 1N 68W | Footage: 1295 FSL 67 FWL | Proposed Depth/Form: | 8484 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: 3:W/2SW/4 4:E/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 665, Top: , Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8079 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8079 ft. |
| | |
Wellbore Completed | Completion Date: | 7/7/2010 | Spud Date: | 7/2/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8530 ft. | Measured PB depth: | 8499 ft. | True Vertical TD: | 8382 ft. | True Vertical PB depth: | 8351 ft. | Top PZ Location: | Sec:3 Twp: 1N 68W | Footage: 1313 FSL 57 FWL | Bottom Hole Location: | Sec:3 Twp: 1N 68W | Footage: 1295 FSL 67 FWL | Log Types: | PRELIMINARY FORM 5 | Log Types: | DI-GL-GR, CD-CN-ML, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 970 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 0 ft., Bottom: 970 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8520 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 650, Top: 4266 ft., Bottom: 8520 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4266 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 686 ft., Bottom: 4266 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4256 ft. | | | | SUSSEX | 4758 ft. | | | | SHANNON | 5276 ft. | | | | NIOBRARA | 7611 ft. | | | | FORT HAYS | 7936 ft. | | | | CODELL | 7958 ft. | | | | J SAND | 8374 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/11/2019 Interval Top: 8386 ft. Interval Bottom: 8406 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/1/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/13/2010 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 150,528 gal Slickwater w/ 115,140# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/14/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | BTU_GAS | 1272 | CALC_BBLS_OIL | 1 | CALC_GOR | 2000 | CALC_MCF_GAS | 2 | CASING_PRESS | 2550 | GRAVITY_OIL | 51 | MCF_GAS | 2 |
| Perforation Data: | Interval Top: | 8386 ft. | # Of Holes: | 64 | Interval Bottom: | 8406 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/11/2019 Interval Top: 7724 ft. Interval Bottom: 7978 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/1/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/4/2010 | Treatment Summary: | NB Perf 7724-7832 Holes 66 Size 0.42 CD Perf 7958-7978 Holes 60 Size 0.42
10/4/2010-Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 121,034 gal Slickwater w/ 200,200# 40/70, 4,000# SB Excel (incomplete job -plan to refrac Nio stage again)
10/7/2010-Frac Niobrara B & C down 4-1/2" Csg w/ 245,364 gal Slickwater w/ 200,250# 40/70, 4,000# SB Excel
10/4/2010-Frac Codell down 4-1/2" Csg w/ 209,883 gal Slickwater w/ 150,020# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/14/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 103 | BTU_GAS | 1272 | CALC_BBLS_OIL | 103 | CALC_GOR | 1495 | CALC_MCF_GAS | 154 | CASING_PRESS | 2550 | GRAVITY_OIL | 51 | MCF_GAS | 154 |
| Perforation Data: | Interval Top: | 7724 ft. | # Of Holes: | 126 | Interval Bottom: | 7978 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 11/11/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|