|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/11/2022 Measured TD: 8680 ft. Vertical TD: 8499 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/11/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/24/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 1966 FSL 1924 FWL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 1970 FSL 1932 FWL | | Proposed Depth/Form: | 8748 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8748 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8748 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/13/2010 | | Spud Date: | 7/5/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8680 ft. | Measured PB depth: | 8570 ft. | | True Vertical TD: | 8499 ft. | True Vertical PB depth: | 8389 ft. | | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 1966 FSL 1924 FWL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 1970 FSL 1932 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | P/E AILC-CNLD-ML; CBL run 8/19/10 and 11/9/10 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1017 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1017 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8641 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 7590 ft., Bottom: 8641 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7570 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 7274 ft., Bottom: 7570 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5871 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 495, Top: 2495 ft., Bottom: 5880 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4354 ft. | | | | | SUSSEX | 4777 ft. | | | | | NIOBRARA | 7559 ft. | | | | | FORT HAYS | 7870 ft. | | | | | CODELL | 7890 ft. | | | | | J SAND | 8332 ft. | | | | | DAKOTA | 8512 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/11/2022 Interval Top: 8340 ft. Interval Bottom: 8366 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2010 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 142,044 gal Slickwater w/ 115,520# 40/70, 4,060# SB Excel |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8333 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/7/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1297 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 5700 | | CALC_MCF_GAS | 57 | | CASING_PRESS | 1137 | | GRAVITY_OIL | 48 | | MCF_GAS | 57 | | TUBING_PRESS | 661 |
| | Perforation Data: | | Interval Top: | 8340 ft. | # Of Holes: | 78 | | Interval Bottom: | 8366 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/11/2022 Interval Top: 7668 ft. Interval Bottom: 7892 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2010 | | Treatment Summary: | NB Perf 7668-7750 Holes 48 Size 0.42 CD Perf 7892-7902 Holes 40 Size 0.42
11/19/2010-Frac Niobrara B & C down 2-7/8" Tbg w/ Pkr ^ Nio w/ 250 gal 15% HCl & 168,874 gal Dynaflow 2 Hybrid w/ 250,060# 20/40, 4,000# SuperLC.
10/18/2010-Frac Codell down 4-1/2" Csg w/ 203,797 gal Slickwater w/ 150,500# 40/70, 4,200# SB Excel |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8333 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/7/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1297 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 5700 | | CALC_MCF_GAS | 57 | | CASING_PRESS | 1137 | | GRAVITY_OIL | 48 | | MCF_GAS | 57 | | TUBING_PRESS | 661 |
| | Perforation Data: | | Interval Top: | 7668 ft. | # Of Holes: | 88 | | Interval Bottom: | 7892 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/11/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|