|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/11/2019 Measured TD: 8437 ft. Vertical TD: 8374 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/11/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/24/2012 | | Proposed Top PZ Location: | Sec:3 Twp: 1N 68W | Footage: 1963 FSL 1962 FWL | | Bottom Hole Location: | Sec:3 Twp: 1N 68W | Footage: 1975 FSL 1960 FWL | | Proposed Depth/Form: | 8425 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 665, Top: , Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8425 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8425 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/11/2010 | | Spud Date: | 7/7/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8437 ft. | Measured PB depth: | 8323 ft. | | True Vertical TD: | 8374 ft. | True Vertical PB depth: | 8260 ft. | | Top PZ Location: | Sec:3 Twp: 1N 68W | Footage: 1963 FSL 1962 FWL | | Bottom Hole Location: | Sec:3 Twp: 1N 68W | Footage: 1975 FSL 1960 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 967 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 967 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8385 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 639, Top: 4164 ft., Bottom: 8385 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4164 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 953 ft., Bottom: 4164 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4156 ft. | | | | | SUSSEX | 4644 ft. | | | | | SHANNON | 5174 ft. | | | | | NIOBRARA | 7527 ft. | | | | | FORT HAYS | 7819 ft. | | | | | CODELL | 7840 ft. | | | | | J SAND | 8282 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 11/11/2019 Interval Top: 7638 ft. Interval Bottom: 7866 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/7/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/11/2010 | | Treatment Summary: | NB Perf 7638-7714 Holes 60 Size 0.42 CD Perf 7842-7866 Holes 72 Size 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 248,138 gal Slickwater w/ 101,640# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 205,716 gal Slickwater w/ 75,440# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 95 | | CALC_BBLS_OIL | 95 | | CALC_GOR | 2737 | | CALC_MCF_GAS | 260 | | CASING_PRESS | 2350 | | GRAVITY_OIL | 51 | | MCF_GAS | 260 |
| | Perforation Data: | | Interval Top: | 7638 ft. | # Of Holes: | 132 | | Interval Bottom: | 7866 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/11/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|