|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/8/2019 Measured TD: 8595 ft. Vertical TD: 8529 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/8/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/20/2012 | Prop Depth/Form: | 8623 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 690, Top: 0 ft., Bottom: 985 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8623 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8623 ft. |
| | |
Wellbore Completed | Completion Date: | 7/30/2010 | Spud Date: | 7/25/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8595 ft. | Measured PB depth: | 8106 ft. | True Vertical TD: | 8529 ft. | True Vertical PB depth: | 8040 ft. | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 1991 FNL 656 FWL | Depth | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 1991 FNL 661 FWL | Depth | Log Types: | PRELIMINARY FORM 5 | Log Types: | CD-CN-ML, DI-GL-GR; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1010 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1010 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8583 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 155, Top: 6500 ft., Bottom: 8583 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5745 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 660, Top: 920 ft., Bottom: 5745 ft., Determination Method: CALC | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5740 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 660, Top: 1000 ft., Bottom: 5780 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1000 ft., Depth: 5740 ft., Bottom: 5780 ft., Sacks: 660, Method: DV TOOL | Additional Cement: | String Type: S.C. 1.1 , Top: 5745 ft., Depth: 8583 ft., Bottom: 8583 ft., Sacks: 155, Method: DV TOOL | Additional Cement: | String Type: S.C. 1.2 , Top: 920 ft., Depth: 5745 ft., Bottom: 5745 ft., Sacks: 660, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4250 ft. | | | | SUSSEX | 4756 ft. | | | | NIOBRARA | 7417 ft. | | | | FORT HAYS | 7721 ft. | | | | CODELL | 7742 ft. | | | | J SAND | 8180 ft. | | | | DAKOTA | 8363 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 1/17/2011 Interval Top: 8424 ft. Interval Bottom: 8448 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/1/2011 | Treatment Summary: | Frac Dakota down 2-7/8" Tbg w/ Pkr w/ 18,568 gal Vistar 70 Quality N2 w/ 9,000# 100 Mesh , 48,000# 20/40 Ottawa & 8,000# 20/40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 8424 ft. | # Of Holes: | 72 | Interval Bottom: | 8448 ft. | Hole Size: | 0.38 in. |
|
Formation JSND Formation Classification: GW Status: AB - 2/8/2019 Interval Top: 8188 ft. Interval Bottom: 8206 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/14/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 148,497 gal Slickwater w/ 115,800# 40/70, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8188 ft. | # Of Holes: | 54 | Interval Bottom: | 8206 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/16/2011 Interval Top: 7514 ft. Interval Bottom: 8206 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/14/2011 | Treatment Summary: | NB Perf 7514-7618 Holes 66 Size 0.38
CD Perf 7745-7761 Holes 64 Size 0.42
J S Perf 8188-8206 Holes 54 Size 0.38 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/16/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 61 | BTU_GAS | 1135 | CALC_BBLS_OIL | 61 | CALC_GOR | 3081 | CALC_MCF_GAS | 188 | CASING_PRESS | 781 | GRAVITY_OIL | 42 | MCF_GAS | 188 |
| Perforation Data: | Interval Top: | 7514 ft. | # Of Holes: | 184 | Interval Bottom: | 8206 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/8/2019 Interval Top: 7514 ft. Interval Bottom: 7761 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/1/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/17/2011 | Treatment Summary: | NB Perf 7514-7618 Holes 66 Size 0.38 CD Perf 7745-7761 Holes 64 Size 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 244,736 gal Slickwater w/ 201,200# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 190,806 gal Slickwater w/ 151,200# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7514 ft. | # Of Holes: | 128 | Interval Bottom: | 7761 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|