Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31325
Well Classification: OW Status: SI - 3/1/2021
Well Name/No:Critter Creek #7-13H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BISON IV OPERATING LLC - 10670
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2021
FacilityID:416285LocationID:416288
County:WELD #123Location:NWNW 13 11N63W 6
Field:HEREFORD - #34200Elevation:5237 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:600FNL  501 FWLLat/Long: 40.928042 / -104.388717Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.928047 / -104.388711Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/14/2011
End Date: 6/14/2011
Reported: 6/6/2012
Prior to rule 205A.b.(2)(A)
Days to report: 358
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2021             Measured TD: 12780 ft.    Vertical TD: 7241 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2012
Proposed Top PZ Location:Sec:13 Twp: 11N 63W Footage: 1126 FNL  749 FWL
Bottom Hole Location:Sec:13 Twp: 11N 63W Footage: 648 FSL  631 FEL
Proposed Depth/Form:12867 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 421-1 , Unit Acreage: 640, Drill Unit: ALL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1300 ft., Weight: 36 Lbs , Citings Type: PLANNED
Cement:Sacks: 680, Top: 0 ft., Bottom: 1300 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 7495 ft., Weight: 23 Lbs , Citings Type: PLANNED
Cement:Sacks: 795, Top: 0 ft., Bottom: 7495 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 12867 ft., Weight: 11.6 Lbs , Citings Type: PLANNED
Cement:Sacks: 460, Top: 6644 ft., Bottom: 12867 ft.

Wellbore Completed
Completion Date:5/14/2011
Spud Date:4/28/2011Spud Date Is:ACTUAL
Measured TD:12780 ft.Measured PB depth:7528 ft.
True Vertical TD:7241 ft.True Vertical PB depth:7254 ft.
Top PZ Location:Sec:13 Twp: 11N 63WFootage: 1126 FNL  749 FWL
Bottom Hole Location:Sec:13 Twp: 11N 63WFootage: 648 FSL  631 FEL
Log Types:CBL/GR, MUD - 2
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 39, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1327 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1327 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7572 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 1500 ft., Bottom: 7572 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 6743 ft., Depth: 12776 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX3491 ft.
HYGIENE4162 ft.
SHARON SPRINGS7328 ft.
NIOBRARA7439 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 3/1/2021                  Interval Top: 7835 ft.    Interval Bottom: 12555 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/27/2011Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/30/2011
Treatment Summary:Fraced with 243,515 gals Linear Gel 20, 376,866 gals Lightning D 20, 87,402 Treated Fresh Water and 614,275# 20/40 sand.
Formation Treatment
Treatment Date:6/13/2011
Treatment Summary:Fraced with 243,515 gals Linear Gel 20, 376,866 gals Lightning D 20, 87,402 Treated Fresh Water and 614,275# 20/40 sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 245
BTU_GAS 1142
CALC_BBLS_H2O 245
CALC_MCF_GAS 6
CASING_PRESS 100
GRAVITY_OIL 34
MCF_GAS 6
TUBING_PRESS 180
Perforation Data:
Interval Top:7835 ft.# Of Holes:324
Interval Bottom:12555 ft.Hole Size:0.75 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY10/27/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
02/28/2021
Low ProducingYProduction Period
09/2024 - 08/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No