|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/10/2020 Measured TD: 8607 ft. Vertical TD: 8512 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/10/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/19/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 1980 FSL 1980 FEL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 1980 FSL 1980 FEL | | Proposed Depth/Form: | 8627 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8627 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8627 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/8/2010 | | Spud Date: | 9/1/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8607 ft. | Measured PB depth: | 8560 ft. | | True Vertical TD: | 8512 ft. | True Vertical PB depth: | 8465 ft. | | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 1960 FSL 1987 FEL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 1953 FSL 1999 FEL | | Log Types: | Preliminary Form 5 | | Log Types: | CBL(12/17/2010), CBL (1/19/2011), PE-AI-LC, PE-CN-LD, PE-TC, PE-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1014 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1014 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 8597 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 7744 ft., Bottom: 8597 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7715 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 90, Top: 7170 ft., Bottom: 7744 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5644 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 205, Top: 744 ft., Bottom: 5670 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 744 ft., Depth: 5644 ft., Bottom: 5644 ft., Sacks: 205, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 7170 ft., Depth: 7744 ft., Bottom: 7744 ft., Sacks: 90, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4266 ft. | | | | | SUSSEX | 4646 ft. | | | | | NIOBRARA | 7430 ft. | | | | | FORT HAYS | 7749 ft. | | | | | CODELL | 7770 ft. | | | | | J SAND | 8216 ft. | | | | | DAKOTA | 8394 ft. | | | |
Formation NB-CD Formation Classification: Status: AB - 2/20/2020 Interval Top: 7544 ft. Interval Bottom: 7787 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/11/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/4/2011 | | Treatment Summary: | NB PERF 7544-7642 HOLES 44 SIZE .42 CD PERF 7773-7787 HOLES 42 SIZE .38
Frac Niobrara B & C down 2-7/8" Tbg w/ Pkr ^ Nio w/ 252 gal 15% HCl & 164,556 gal Super Z LpH Hybrid w/ 251,060# 20/40, 4,000# SB Excel.
Frac Codell down 2-7/8" Tbg w/ Pkr ^ Nio w/ 129,402 gal Super Z LpH w/ 220,920# 20/40, 4,000# SB Excel. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7743 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | BTU_GAS | 1168 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 5933 | | CALC_MCF_GAS | 89 | | CASING_PRESS | 1594 | | GRAVITY_OIL | 45 | | MCF_GAS | 89 | | TUBING_PRESS | 1233 |
| | Perforation Data: | | Interval Top: | 7544 ft. | # Of Holes: | 86 | | Interval Bottom: | 7787 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/20/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|