|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/8/2017 Measured TD: 7901 ft. Vertical TD: 7842 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/8/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/19/2012 | Proposed Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 511 FNL 2113 FEL | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 498 FNL 2120 FEL | Proposed Depth/Form: | 8604 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8604 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8604 ft. |
| | |
Wellbore Completed | Completion Date: | 9/12/2010 | Spud Date: | 9/8/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7901 ft. | Measured PB depth: | 7859 ft. | True Vertical TD: | 7842 ft. | True Vertical PB depth: | 7800 ft. | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 511 FNL 2113 FEL | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 498 N 2120 E | Log Types: | Preliminary Form 5 | Log Types: | GR-CCL-CB-VDL, PE-AI-LC, PE-CN-DL, PE-ML, PE-CV-C | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1012 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1012 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 6.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7891 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 465, Top: 2372 ft., Bottom: 7891 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4242 ft. | | | | SUSSEX | 4598 ft. | | | | NIOBRARA | 7388 ft. | | | | FORT HAYS | 7715 ft. | | | | CODELL | 7737 ft. | | | |
Formation NB-CD Formation Classification: Status: AB - 6/8/2017 Interval Top: 7510 ft. Interval Bottom: 7753 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/7/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/30/2010 | Treatment Summary: | NB PERF: 7510-7608 HOLES 66 SIZE .42 CD PERF: 7739-7753 HOLES 56 SIZE .38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 238,686 gal Slickwater w/ 200,740# 40/70, 4,000# SuperLC.
Frac Codell down 4-1/2" Csg w/ 197,652 gal Slickwater w/ 150,120# 40/70, 4,000# SuperLC. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7715 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/23/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 35 | BTU_GAS | 1168 | CALC_BBLS_OIL | 35 | CALC_GOR | 371 | CALC_MCF_GAS | 13 | CASING_PRESS | 1550 | GRAVITY_OIL | 45 | MCF_GAS | 13 | TUBING_PRESS | 1535 |
| Perforation Data: | Interval Top: | 7510 ft. | # Of Holes: | 122 | Interval Bottom: | 7753 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/08/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|