Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31309
Well Classification: OW Status: TA - 11/16/2020
Well Name/No:WALCKER USX AB #01-05P
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/16/2020
FacilityID:416219LocationID:416249
County:WELD #123Location:SWNW 1 7N64W 6
Field:WATTENBERG - #90750Elevation:4853 ft.
Planned Location:1800FNL  840 FWLLat/Long: 40.604580 / -104.503530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.604580 / -104.503546Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 11/16/2020             Measured TD: 7270 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 11/16/2020
Wellbore Permit
Permit #: Expiration Date:3/17/2012
Prop Depth/Form:9150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: UNSPACED , Unit Acreage: 80, Drill Unit: W/2NW/4
Formation And Spacing:Code: LYNS , Formation: LYONS , Order: UNSPACED , Unit Acreage: 80, Drill Unit: W/2NW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: UNSPACED , Unit Acreage: 80, Drill Unit: W/2NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 165, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 9150 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 622, Top: , Bottom: 9150 ft.

Wellbore Completed
Completion Date:8/20/2010
Spud Date:8/16/2010Spud Date Is:ACTUAL
Measured TD:7270 ft.Measured PB depth:7220 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL/GRL/CCL, SDL/DSNL/ACL/TRL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 810 ft., Weight: 24.00 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: 822 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7266 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 2410 ft., Bottom: 7266 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6749 ft.
FORT HAYS7044 ft.
CODELL7068 ft.
GREENHORN7141 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/19/2020                Interval Top: 7069 ft.    Interval Bottom: 7079 ft.

 Completed Information for Formation CODELL
1st Production Date:11/5/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7069 ft.# Of Holes:40
Interval Bottom:7079 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 11/16/2020                Interval Top: 6767 ft.    Interval Bottom: 7079 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/5/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/6/2010
Treatment Summary:Frac'd Niobrara / Codell w/ 306960 gals of Silverstim and Slick Water with 517,500#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 38
BTU_GAS 1258
CALC_BBLS_H2O 55
CALC_BBLS_OIL 38
CALC_GOR 421
CALC_MCF_GAS 16
CASING_PRESS 250
GRAVITY_OIL 38
MCF_GAS 16
TUBING_PRESS 100
Perforation Data:
Interval Top:6767 ft.# Of Holes:88
Interval Bottom:7079 ft.Hole Size:0 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/19/2020                Interval Top: 6767 ft.    Interval Bottom: 6904 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/5/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6767 ft.# Of Holes:48
Interval Bottom:6904 ft.Hole Size:0.73 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No