|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/14/2017 Measured TD: 8621 ft. Vertical TD: 8238 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/14/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/9/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 50 FSL 50 FEL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 50 FSL 50 FEL | | Proposed Depth/Form: | 8580 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 985 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: , Bottom: 985 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8580 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8580 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/5/2010 | | Spud Date: | 9/28/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8621 ft. | Measured PB depth: | 8581 ft. | | True Vertical TD: | 8238 ft. | True Vertical PB depth: | 8198 ft. | | Top PZ Location: | Sec:9 Twp: 1N 67W | Footage: 66 FSL 80 FEL | | Bottom Hole Location: | Sec:9 Twp: 1N 67W | Footage: 67 FSL 72 FEL | | Log Types: | Preliminary Form 5 | | Log Types: | CD-CN-ML, DI-GL-GR; CBL-12/15/10; CBL 5/9/11 | | Casing: | String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1016 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1016 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1016 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1016 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8613 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 8116 ft., Bottom: 8613 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8040 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 7280 ft., Bottom: 8040 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5930 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 405, Top: 1270 ft., Bottom: 5950 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 816 ft., Depth: 5930 ft., Bottom: 5835 ft., Sacks: 405, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 1270 ft., Depth: 5930 ft., Bottom: 5835 ft., Sacks: 405, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 7410 ft., Depth: 7430 ft., Bottom: 8044 ft., Sacks: 120, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 7284 ft., Depth: 7284 ft., Bottom: 7314 ft., Sacks: 30, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4696 ft. | | | | | NIOBRARA | 7678 ft. | | | | | FORT HAYS | 8000 ft. | | | | | CODELL | 8021 ft. | | | | | J SAND | 8465 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 3/14/2017 Interval Top: 7798 ft. Interval Bottom: 8040 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/27/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/18/2011 | | Treatment Summary: | NB PERF 7798-7895 HOLES 62 SIZE 0.42 CD PERF 8024-8040 HOLES 64 SIZE 0.38
Frac Niobrara w/ 210 gal 15% HCl & 160,940 gal Dynaflow 2 Hybrid w/ 250,280# 20/40, 4,000# SuperLC
Frac Codell w/ 142,934 gal Dynaflow 2 w/ 221,420# 20/40, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/27/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 50 | | BTU_GAS | 1299 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1437 | | GRAVITY_OIL | 47 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7798 ft. | # Of Holes: | 126 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/14/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|